MétaCan
Menu
Back to cohort
Record W4381280393 · doi:10.1108/ijmpb-10-2020-0306

Crisis management process for project-based organizations

2023· article· en· W4381280393 on OpenAlexaff
Rehab Iftikhar, Mehwish Majeed, Nathalie Drouin

Bibliographic record

VenueInternational Journal of Managing Projects in Business · 2023
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsUniversité du Québec à Montréal
Fundersnot available
KeywordsOriginalityThematic analysisProcess (computing)Knowledge managementProcess managementOutcome (game theory)Crisis managementInterpretation (philosophy)Conceptual modelQualitative researchManagement scienceConceptual frameworkValue (mathematics)Computer scienceProject managementSociologyManagementBusinessEngineeringSocial scienceEconomics

Abstract

fetched live from OpenAlex

Purpose The purpose of this paper is to study the crisis management process for project-based organizations (PBOs) by developing a comprehensive model and propositions. Design/methodology/approach This paper is based on a conceptual study. A literature review is considered a primary source for studying contemporary research, including 171 publications in total, which embody qualitative, quantitative, conceptual and theoretical studies. For data analysis, content analysis is used, which is comprised of descriptive and thematic analysis. Findings This study identifies five imperative elements of crisis management for PBOs which include (1) sense-making (information gathering and crisis interpretation), (2) decision-making (accurate and timely decision), (3) response (reactive response), (4) outcome (success/failure) and (5) learning. Based on these findings, this study proposes an integrative model of the interplay between sense-making, decision-making, response, outcome and learning. Furthermore, the findings lead to propositions for each of the elements. The paper contributes to the literature on dynamic capability theory. Originality/value This paper explores the crisis management process for PBOs. The proposed model deepens the understanding of the practices and processes of project-based crisis management.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.009
metaresearch head score (Gemma)0.022
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Qualitative · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.009
Threshold uncertainty score0.045

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0090.022
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.002
Science and technology studies0.0030.003
Scholarly communication0.0060.005
Open science0.0010.004
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0040.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.103
GPT teacher head0.423
Teacher spread0.320 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designQualitative
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations30
Published2023
Admission routes1
Has abstractyes

Explore more

Same venueInternational Journal of Managing Projects in BusinessSame topicConstruction Project Management and PerformanceFrench-language works237,207