Permanent secant pile wall for underground transit station
Bibliographic record
Abstract
Secant piles have been traditionally used as temporary support of excavation for cut-and-cover tunnels and shafts. Alternatively, the secant piles can be integrated into the permanent structure, where it not only provides the excavation support during construction, but also forms the envelope supporting the gravity and lateral loads from the permanent structure. This offers numerous advantages, including reduced excavation cost and time for construction. This was recently used with great success in construction of an approach structure and an underground station as part of the one of the largest transit systems in North America, Réseau Express Métropolitain (REM) located in Montreal, Canada. The current paper presents a case study based on a project where secant piles were used as the permanent liner. Various structural and waterproofing solutions implemented to achieve a cost-effective design are presented along with techniques to ensure water-tight structure with more than 100 years of service life.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".