MétaCan
Menu
Back to cohort
Record W4381827082 · doi:10.1201/9781003348030-196

Montreal metro blue line extension tunnels and caverns

2023· book-chapter· en· W4381827082 on OpenAlexaffabout
Mehdi Bakhshi, G. Maurel, R. Saghaee

Bibliographic record

Venuenot available
Typebook-chapter
Languageen
FieldEngineering
TopicUnderground infrastructure and sustainability
Canadian institutionsAecom (Canada)
Fundersnot available
KeywordsExtension (predicate logic)Line (geometry)GeologyEngineeringComputer scienceGeometryMathematics

Abstract

fetched live from OpenAlex

The development of the Montreal metro Line 5 also known as Blue Line Extension toward the northeast are located between the existing Saint-Michel station and Anjou. It consists of 6-km long double track tunnel, five new stations and seven auxiliary structures. Most of tunnel length (5.5 km) will be excavated by a 9.6 m diameter shielded rock TBM and supported by a precast segmental tunnel lining system. Based on the project master schedule, the five stations will be built first and then the TBM will skid through the already built stations. For the inter-station tunnels, the shielded rock TBM excavation method with segmental liner installation was selected based on the existing geotechnical challenges, evaluation of the project construction cost, schedule and risk, noise, and vibration. TBM will be fitted for probing and pre-excavation grouting to control water inflow into the tunnel during the excavation in fractured limestone and shale formation under the downtown of Montreal where lower rock quality and high water infiltration rates are anticipated. The latest development in segmental liner technology and the latest segmental liner design code ACI 533.5-20 were used for the design of the tunnel segmental liner of this project. The stations and auxiliary structures will be built using the controlled drill and blast method or roadheader. Two thin layers of shotcrete separated by a layer of spray-on membrane will be used as the initial and final liner of the underground stations and auxiliary structures resulting in significant construction cost and time savings. This paper presents major design aspects of the TBM tunnel and mined station caverns of this major project in Montreal, Canada.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: Theoretical or conceptual
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.260
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.012
GPT teacher head0.200
Teacher spread0.188 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designTheoretical or conceptual
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2023
Admission routes2
Has abstractyes

Explore more

Same topicUnderground infrastructure and sustainabilityFrench-language works237,207