MétaCan
Menu
Back to cohort
Record W4386259964 · doi:10.23865/arctic.v14.5619

Implementing UNDRIP in British Columbia in a Post-Yahey Context: What to Expect After the Yahey v. BC Litigation (S151727) and the Agreement on Industrial Development and Cumulative Effects Management

2023· article· en· W4386259964 on OpenAlexaffabout
Giuseppe Amatulli

Bibliographic record

VenueArctic review on law and politics · 2023
Typearticle
Languageen
FieldEngineering
TopicMining and Resource Management
Canadian institutionsCarleton University
Fundersnot available
KeywordsContext (archaeology)TreatyGovernment (linguistics)Public administrationIndigenousLawSupreme courtPolitical scienceEconomic growthGeographyEconomicsArchaeology

Abstract

fetched live from OpenAlex

Almost two years after the ground-breaking verdict that the Supreme Court of British Columbia issued in the context of the Yahey v. BC litigation, on January 18, 2023, the Province of British Columbia signed a historic agreement with Blueberry River First Nation (BRFN) to address the cumulative effects of industrial development on the meaningful exercise of Treaty 8 rights in the Nation’s traditional territory while establishing collaborative approaches to land and resource planning. At the same time, the Province concluded agreements with other Treaty 8 First Nations (Doig River, Fort Nelson, McLeod Lake, Prophet River, Saulteau and West Moberly First Nations) concerning cumulative effects management, land planning and resource exploitation. These agreements have been praised as ground-breaking steps towards a new relationship that Government and Industry are eager to build with First Nations while healing the land and ensuring certainty for Industry to carry on resource development in British Columbia. This happens as the Province and the Federal Government move forward with their action plans to implement the United Nations Declaration on the Rights of Indigenous Peoples (hereafter UNDRIP) at the provincial and federal levels. It also comes at a time of significant challenges British Columbia must face, between new First Nations development projects (i.e., the Cedar LNG project) that the Province is actively supporting and recent litigations initiated by some First Nations to see UNDRIP adequately implemented in the BC legal framework (i.e., the trial initiated by Gitxaala and Ehattesaht First Nations concerning the lack of consultation regarding how BC grants mineral claims).

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.004
metaresearch head score (Gemma)0.010
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.124
Threshold uncertainty score0.901

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0040.010
Meta-epidemiology (narrow)0.0000.001
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.002
Science and technology studies0.0250.010
Scholarly communication0.0170.003
Open science0.0030.004
Research integrity0.0070.011
Insufficient payload (model declined to judge)0.0090.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.016
GPT teacher head0.243
Teacher spread0.227 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations4
Published2023
Admission routes2
Has abstractyes

Explore more

Same venueArctic review on law and politicsSame topicMining and Resource ManagementFrench-language works237,207