MétaCan
Menu
Back to cohort
Record W4386697161 · doi:10.2172/1999387

Electrical Infrastructure Cost Model for Marine Energy Systems

2023· report· en· W4386697161 on OpenAlexfundno aff
Aryana Nakhai

Bibliographic record

Venuenot available
Typereport
Languageen
FieldEnvironmental Science
TopicMaritime Transport Emissions and Efficiency
Canadian institutionsnot available
FundersOffice of Energy EfficiencyU.S. Department of EnergyOffice of Energy Efficiency and Renewable EnergyWater Power Technologies OfficeNational Renewable Energy LaboratoryMcMaster University
KeywordsSizingFlexibility (engineering)Offshore wind powerWind powerRenewable energyScale (ratio)Cost estimateSubmarine pipelineEngineeringReliability engineeringComputer scienceSystems engineeringElectrical engineering

Abstract

fetched live from OpenAlex

The National Renewable Energy Laboratory's Electrical Infrastructure Cost Model is an Excel-based tool designed to estimate the electrical infrastructure costs of marine energy components and subsystems. It incorporates data collected from offshore wind projects, utility projects, and other relevant sources to provide accurate and comprehensive cost projections. With its user-friendly interface, the model allows users to input various parameters related to the system array, electrical cables, and substations. By leveraging industry data, cost trends, and technological advancements, the model generates outputs that include system array sizing, electrical cable specifications and costs, substation specifications and costs, and total electrical infrastructure costs. One of the notable strengths of the model is its flexibility in covering multiple-orders-of-magnitude scaled systems, accommodating projects ranging from proof-of-concept or pilot-scale installations to large-scale offshore systems. By collecting data largely from offshore wind reports and utility projects, the model incorporates real-world conditions and accounts for industry-specific factors. It incorporates cost trends and sizing relationships to deliver cost estimations for electrical infrastructure components, such as electrical cables and substation equipment.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.029
Threshold uncertainty score0.064

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.002
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.002
Science and technology studies0.0000.000
Scholarly communication0.0010.002
Open science0.0020.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0190.003

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.036
GPT teacher head0.281
Teacher spread0.245 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations9
Published2023
Admission routes1
Has abstractyes

Explore more

Same topicMaritime Transport Emissions and EfficiencyFrench-language works237,207