Towards Human–Robot Collaboration in Construction: Understanding Brickwork Production Rate Factors

2023· article· en· W4389626402 on OpenAlexaff
Ronald Ekyalimpa, Emmanuel Okello, Nasir Bedewi Siraj, Zhen Lei, Hexu Liu

Bibliographic record

VenueBuildings · 2023
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of New Brunswick
Fundersnot available
KeywordsBrickworkContext (archaeology)EngineeringProductivityVariance (accounting)Operations managementProduction (economics)MathematicsOperations researchKnowledge managementMarketingManagementStatisticsComputer scienceBusinessGeographyCivil engineeringEconomicsAccounting

Abstract

fetched live from OpenAlex

This study explores the critical determinants impacting labor productivity in brickwork operations within the construction industry—a matter of academic and practical significance, particularly in the era of increasing human–robot collaboration. Through an extensive literature review on construction labor productivity, this study identifies factors affecting brickwork productivity. Data were collected from active construction sites during brick wall construction through on-site measurements and participatory observation, and the relative importance of these factors is determined using Principal Component Analysis (PCA)-factor analysis. The validity of the analysis is established through the Kaiser–Meyer–Olkin (KMO) test and Bartlett’s test of sphericity, with a KMO value of 0.544 and significance at the 0.05 significance level. The analysis reveals four principal components explaining 75.96% of the total variance. Notably, this study identifies the Euclidean distances for the top factors: weather (0.980), number of helpers (0.965), mason competency (0.934), and number of masons (0.772). Additionally, correlation coefficients were observed: wall area had the highest correlation (0.998), followed by wall length (0.853) and height (0.776). Interestingly, high correlations did not necessarily translate to high factor importance. These identified factors can serve as a foundation for predictive modeling algorithms for estimating production rates and as a guideline for optimizing labor in construction planning and scheduling, particularly in the context of human–robot collaboration.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.268
Threshold uncertainty score0.619

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.002
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.032
GPT teacher head0.259
Teacher spread0.228 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations7
Published2023
Admission routes1
Has abstractyes

Explore more

Same venueBuildingsSame topicBIM and Construction IntegrationFrench-language works237,207