Innovative Cost Estimation for Agile Technology: A Novel Energy Storage Technique Incorporating Modified Planning Poker
Bibliographic record
Abstract
Effort estimation is a critical aspect of every software creation project, irrespective of its development discipline, is it traditional or agile. Despite the initial limited project knowledge, accurate estimation of workload and effort holds immense significance for project success. This study addresses the challenges surrounding precise effort estimation and introduces the poker planning method utilizing a modified Fibonacci sequence as a potential solution. The aim of this paper is to examine the behavior and effectiveness of the modified Fibonacci sequence in the context of cost estimation within the agile methodology. By leveraging historical data, expert opinions, and an iterative approach, the proposed technique is evaluated and compared against traditional methods. The results provide insights into the performance of the modified Fibonacci sequence, offering a valuable contribution to enhancing accuracy in cost estimation for agile software development projects.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.003 | 0.004 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.004 | 0.004 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.001 |
| Open science | 0.002 | 0.001 |
| Research integrity | 0.000 | 0.001 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".