MétaCan
Menu
Back to cohort
Record W4391156990 · doi:10.3390/min14020123

Integrated Stochastic Underground Mine Planning with Long-Term Stockpiling: Method and Impacts of Using High-Order Sequential Simulations

2024· article· en· W4391156990 on OpenAlexafffund
Laura Carelos Andrade, Roussos Dimitrakopoulos

Bibliographic record

VenueMinerals · 2024
Typearticle
Languageen
FieldEngineering
TopicMining Techniques and Economics
Canadian institutionsMcGill University
FundersIAMGOLDAngloGold AshantiNatural Sciences and Engineering Research Council of CanadaCanada Research Chairs
KeywordsTerm (time)Order (exchange)Mining engineeringComputer scienceEnvironmental scienceGeologyBusiness

Abstract

fetched live from OpenAlex

The integrated optimization of stope design and underground mine production scheduling is an approach that has been shown to effectively leverage the synergies among these two underground mine planning components to generate truly optimal stope layouts and extraction sequences. The existing stochastic integrated methods, however, do not include several elements of a mining complex, such as stockpiles, due to the computational complexity and non-linearity that they might add to the optimization of the long-term mine plan. Additionally, sequential simulation methods that rely on two-point statistics and Gaussian distribution assumptions are commonly used to generate the input realizations of the mineral deposit. These methods, however, are not able to properly characterize complex spatial geometries or the high-grade connectivity of non-Gaussian and non-linear natural phenomena. The present work proposes an extension of previous developments on the integrated stope design and underground mine scheduling optimization through an expanded stochastic integer programming formulation that incorporates long-term stockpiling decisions. An application of the proposed method at an operating underground copper mine compares the cases in which the geological simulated orebody models are based on high-order and Gaussian sequential simulation methods. The extraction sequence and related final stope design are shown to be physically different. It is seen that the optimization process takes advantage of the better representation of high-grade connectivity when high-order sequential simulations are used, by targeting the areas with grades that follow the mill’s blending requirements and by making less use of the stockpiles. Overall, a 4% higher copper metal production and a resultant 6% higher net present value are observed when high-order sequential simulations are used.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.378
Threshold uncertainty score0.564

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.044
GPT teacher head0.318
Teacher spread0.274 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations5
Published2024
Admission routes2
Has abstractyes

Explore more

Same venueMineralsSame topicMining Techniques and EconomicsFrench-language works237,207