Review of accelerated construction of bridge piers - methods and performance
Bibliographic record
Abstract
Abstract Bridges are an essential part of every road and transportation system, and all countries must build bridges to improve their infrastructure. Accelerated bridge construction (ABC) is an innovative approach that has been noticed in recent years to facilitate and accelerate the process of building, repairing, or replacing bridges. This paper underscores the significance of ABC in bridge construction, focusing on its potential to offer speed, safety, and enhanced longevity for bridge pier. Through a comprehensive exploration of prefabricated elements and systems specific to bridge piers, insights into their applicability, advantages, and limitations are presented. A special section is dedicated to the investigation of pier connections under seismic loads. Furthermore, the review contrasts ABC with traditional construction methodologies, highlighting areas of excellence and potential improvement for ABC.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.001 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".