Duration Estimation of a Heavy Industrial Scaffolding Project: A Case Study

2024· article· en· W4391707230 on OpenAlexaff
Samira Rizaee, Zhen Lei

Bibliographic record

VenueJournal of Construction Engineering and Management · 2024
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of New Brunswick
Fundersnot available
KeywordsDuration (music)EstimationScaffoldStatisticsMathematicsEngineeringArtBiomedical engineeringSystems engineering

Abstract

fetched live from OpenAlex

Accurate project duration estimation is crucial for effective scheduling, budgeting, resource allocation, and overall construction management. Leveraging historical data from completed projects is an effective strategy to achieve this. In heavy industrial projects, where scaffolding activities can span from thousands to millions of hours, refining the estimation of scaffolding time is vital during the planning phase. This study undertook the analysis of data from a completed heavy industrial scaffolding project, aiming to propose a methodology and models for predicting future projects durations. The proposed methodology not only aids in improved duration but also contributes to cost estimation, scheduling, and project delivery of similar future endeavors. Commencing with data cleaning and categorizing the data based on activity types, the scatter plots of person-hours versus task weight within each category revealed a linear relationship. Consequently, linear models for each category were developed. Statistical factors such as data size, coefficient of determination, and mean absolute error were then utilized to calculate a score for each model, guiding the model selection process which substituted low score models with a parent category with a higher score. The data analysis and modeling were performed five times to ensure robustness and consistency in the results. On average, the initial models yielded a project duration estimate of only 0.36% higher than the actual duration, while the selected models increased this deviation to 4.14%. The scoring and selection process enhances estimation accuracy while maintaining proximity to actual project durations. This research makes three significant contributions: (1) introducing a categorical linear regression approach for scaffolding activity duration prediction, (2) presenting a novel normalization and scoring method that scores models based on statistical factors, and (3) implementing a practical model selection process to substitute weaker models with stronger ones, ultimately strengthening the reliability of activity and project duration predictions.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.699
Threshold uncertainty score0.361

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.014
GPT teacher head0.233
Teacher spread0.219 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations3
Published2024
Admission routes1
Has abstractyes

Explore more

Same venueJournal of Construction Engineering and ManagementSame topicBIM and Construction IntegrationFrench-language works237,207