MétaCan
Menu
Back to cohort
Record W4392455782 · doi:10.1061/9780784485248.101

Agile Project Planning Framework and Method for Allocating Limited Crews to Drainage Construction Projects

2024· article· en· W4392455782 on OpenAlexaff
Ali Bayesteh, Ming Lu

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsUniversity of Alberta
Fundersnot available
KeywordsAgile software developmentComputer scienceDrainageProject managementConstruction engineeringEngineering managementSystems engineeringEngineeringSoftware engineering

Abstract

fetched live from OpenAlex

Drainage infrastructure maintenance projects are resource-intensive undertakings at the clients’ premises. Their projects’ domain consists of multiple one-of-a-kind small projects scattered over various locations and subject to constant changes over time (emergent projects, deadline changes). Conventional project planning models relying on a sequential phase-to-phase (waterfall) methodology do not lend themselves well to plan crew allocation and job schedules in response to dynamic customers’ demands. This research introduces agile project management methods originated in the software development industry; further a practical agile project management approach is conceptualized to allocate a finite number of crews to perform routine jobs by their respective deadlines while dealing with high-priority jobs or emergency jobs, all subject to the updated constraints on crews’ availability. A drainage service case study is provided to demonstrate method application.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: Theoretical or conceptual
GenreCandidate signal: Methods · Consensus signal: Methods
Teacher disagreement score0.005
Threshold uncertainty score0.014

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.002
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0010.002
Science and technology studies0.0010.001
Scholarly communication0.0020.001
Open science0.0020.002
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0040.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.026
GPT teacher head0.312
Teacher spread0.286 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2024
Admission routes1
Has abstractyes

Explore more

Same topicBIM and Construction IntegrationFrench-language works237,207