MétaCan
Menu
Back to cohort
Record W4399774261 · doi:10.47772/ijriss.2024.805126

Rwanda Towards the Implementation of Montreal Protocol on Substances that Deplete the Ozone Layer. the Current Status of ODS, Ods Alternatives, and HFCS Alternatives.

2024· article· en· W4399774261 on OpenAlexaboutno aff
Védaste Habamenshi, Jonathan Nturo

Bibliographic record

VenueInternational Journal of Research and Innovation in Social Science · 2024
Typearticle
Languageen
FieldEnvironmental Science
TopicInternational Environmental Law and Policies
Canadian institutionsnot available
Fundersnot available
KeywordsMontreal ProtocolProtocol (science)Current (fluid)Ozone layerOzoneLayer (electronics)Environmental scienceBusinessChemistryMedicineGeologyOrganic chemistryOceanography

Abstract

fetched live from OpenAlex

In August 2003, Rwanda ratified both the Vienna Convention for the Protection of the Ozone Layer and the Montreal Protocol on Substances that Deplete the Ozone Layer, along with all the subsequent amendments, including the Kigali Amendment, which was most recently ratified in May 2017. Within this context, by the Law n°63/2013 of 27/08/2013, Rwanda Environment Management Authority (REMA) was created with the legal mandate for national environmental protection, conservation, promotion and overall management, including advisory to the government on all matters pertinent to the environment and climate change. According to Decision XIX/6 of the 19th Meeting of the Parties to the Montreal Protocol on accelerated phase-out of HCFCs, Rwanda is committed to phase-out use of HCFCs by 2030 except for 2.5% for servicing essential use appliances up to 2040. The Hydro chloro fluorocarbons Phase-out Management Plan (HPMP) Stage-I for Rwanda was approved at the 64th Meeting of the Executive Committee for the period 2011 to 2020 to meet a 35% reduction of HCFC by 2020. The HPMP Stage-II has been approved by the 86th meeting of the Executive Committee of the Multilateral Fund Secretariat, to be implemented by UNEP, UNIDO and REMA to enable Rwanda achieve phase-out targets on consumption of Annex C Group 1 Substances of the Montreal Protocol by 2030. The HPMP Stage-II has prioritized key activities to be implemented which include: establishment and implementation of a robust certification scheme for refrigeration technicians, development and implementation of national technical standards in the Refrigeration and Air-Conditioning (RAC) sector that will promote safe use of natural refrigerants and further promote use of highly energy efficiency technologies, capacity building of refrigeration technicians on handling natural refrigerants, training of customs and other enforcement officers on controlling and monitoring HCFC trade and strengthening the Refrigeration Association of Rwanda, technical training institutes and the consumers.The implementation of HPMP Stage-II activities will enable RWANDA reduce consumption of HCFC-22 from the baseline of 4.1 ODP tonnes to 80 percent by 2025 and 100 percent by 2030.This paper represents the results of the national survey conducted to inform the preparation of the project proposal for Kigali HFC Implamentation plan as well as the strategic KIP/HFC phase-down plan.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.731
Threshold uncertainty score0.950

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0030.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0000.003
Scholarly communication0.0000.001
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.087
GPT teacher head0.468
Teacher spread0.381 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2024
Admission routes1
Has abstractyes

Explore more

Same venueInternational Journal of Research and Innovation in Social ScienceSame topicInternational Environmental Law and PoliciesFrench-language works237,207