MétaCan
Menu
Back to cohort
Record W4400013764 · doi:10.18280/jesa.570316

Comparing the Effectiveness of PERT and CPM Techniques in a House Construction Project: A Case Study

2024· article· en· W4400013764 on OpenAlexvenueno aff
Methaq Azeez Jouda, Mushtak A. K. Shiker

Bibliographic record

VenueJournal Européen des Systèmes Automatisés · 2024
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsEngineeringComputer scienceOperations researchEngineering management

Abstract

fetched live from OpenAlex

House construction projects, known for their critical importance and complexity, often face significant constraints related to cost and time.These constraints necessitate the use of robust project management techniques to ensure timely and within-budget completion.This study presents an analysis of key project management methodologies, specifically the critical path method (CPM) and program evaluation and review technique (PERT), in the context of a house construction project.The methodologies employed include the identification of the earliest start and latest finish times, along with forward and backward passes to determine the project's critical path.A comparative analysis of CPM and PERT was conducted, revealing a minor variance of just two days between the two methods in determining project completion.The probability of completing the house construction project within 105 days was calculated to be 74.54%,indicating that both CPM and PERT are effective in ensuring timely project completion.The findings underscore the efficacy and practical benefits of employing CPM and PERT techniques in managing construction projects.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.012
metaresearch head score (Gemma)0.030
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Case report · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.012
Threshold uncertainty score0.063

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0120.030
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0030.003
Science and technology studies0.0010.001
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.018
GPT teacher head0.261
Teacher spread0.243 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designCase report
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2024
Admission routes1
Has abstractyes

Explore more

Same venueJournal Européen des Systèmes AutomatisésSame topicBIM and Construction IntegrationFrench-language works237,207