MétaCan
Menu
← Back to cohort
Record W4402057534 · doi:10.1061/9780784485576.048

Utilizing Existing Resources: Rehabilitation of 72″ Steel Lock-Bar Pipe

2024· article· en· W4402057534 on OpenAlexaff
G. Martínez Gutiérrez, Jeffrey LeBlanc, Jorge-Luis Pérez-Medina, Carl Pitzer

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicGeotechnical Engineering and Underground Structures
Canadian institutionsPrairie Bible InstituteThompson Rivers University
Fundersnot available
KeywordsLock (firearm)Bar (unit)RehabilitationComputer scienceEngineeringStructural engineeringGeology

Abstract

fetched live from OpenAlex

The Western Bays of Long Island New York were once a productive fishing area. Much of the excess nitrogen in the Bay is attributed to wastewater treatment facilities that discharge directly into the Bays. In an effort to improve the marsh’s ecosystem, the New York State Department of Environmental Conservation (NYSDEC) and Nassau County Department of Public Works entered into a unique partnership to implement a Design–Build project that would remove up to 90% of the nitrogen loading in an already compromised area. Up to 75 million gallons per day (MGD) of wet and dry weather flow needed to be diverted from the Bay Park Sewage Treatment Plant (BPSTP) to the Cedar Creek Water Pollution Control Plant (CCWPCP) to be discharged via the existing ocean outfall at that site. This Bay Park Conveyance Project would require the construction of a 12.4-mi long force main from the South Shore Water Reclamation Facility to the existing Cedar Creek Water Pollution Control Plant (WPCP) outfall. The plan was to utilize 7.3 mi of an existing abandoned 72″ steel lock-bar pipe. This aqueduct would require full rehabilitation of the existing pipeline. The preliminary design for the 72″ pipeline was to rehabilitate the pipe by sliplining with Fiberglass Reinforced Polymer Mortar (FRPM) pipe or Steel pipe. Carbon Fiber Reinforced Polymer (CFRP) lining would be considered, but on very limited sections of pipeline due to installation cost and efficiency. The design criteria developed provided the basis for the system design, including appropriate standards, Mandatory Requirement for performance and/or materials, and product specifications. This paper will review this project in detail from cradle to grave covering aspects from the background with initial design parameters and to the process of final design and construction completion. Included in this presentation will also be lessons learned throughout the design and construction process.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.017
Threshold uncertainty score0.033

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0010.001
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0060.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.012
GPT teacher head0.230
Teacher spread0.217 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2024
Admission routes1
Has abstractyes

Explore more

Same topicGeotechnical Engineering and Underground Structures→French-language works237,207→