MétaCan
Menu
← Back to cohort
Record W4402060958 · doi:10.1061/9780784485569.073

Inglewood Sanitary Trunk—Phase 2 Bow River Siphon: A Case Study

2024· article· en· W4402060958 on OpenAlexaffabout
Pat Ilasewich, Marvin McDonald, Sean Frank, Melanie Gray

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEnvironmental Science
TopicForest ecology and management
Canadian institutionsHydro One (Canada)BP (Canada)University of Calgary
Fundersnot available
KeywordsSiphon (mollusc)Phase (matter)Marine engineeringTrunkGeologyPhysicsEngineeringAnatomyMedicineBiologyEcology

Abstract

fetched live from OpenAlex

The Inglewood Sanitary Trunk (IST) was designed to offload wastewater from the Inner City Trunk (ICT) and the West Memorial (WM) trunks, and convey these flows to the Bonnybrook Waste Water Treatment Plant (BBWWTP), servicing the west and northwest areas of the City of Calgary. This offload allows for the existing 15th Avenue trunks to provide additional sanitary capacity to the north portion of the City. Overall, the system provides service to a total equivalent population of 1.1 million residents and will support growth to the 2,076 design horizon. Phase 1 of the trunk was completed in 2020, intercepting the ICT south of the Bow River. Phase 2 has been tendered and is in the early phases of construction. It consists of a twin 1,500 mm by 400 m long siphon crossing of the Bow River, intercepting the West Memorial trunks on the north side of the Bow River. There were many unique design challenges and considerations on this phase of the project. Complex hydraulic considerations were reviewed in order to maintain serviceability of the siphon through its 50 plus year development life. Complicated flow control and bypass strategies were developed to ensure constructability. This included reviewing and developing connection phasing of intercepting two existing 1,200 mm and 1,950 mm trunks which are located under a major arterial roadway, adjacent to LRT, including detour design. Connection to the existing IST Phase 1 utilizing a purpose-built flow diversion and TBM retrieval shaft in a sensitive residential neighborhood. Workspaces needed to be developed in sensitive parklands. Construction utilizing microtunneling was selected to deal with the challenging geological conditions, which were located through an environmentally sensitive river environment. This paper will explore design challenges encountered in the completion of this important wastewater conveyance project.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Case report · Consensus signal: Case report
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.025
Threshold uncertainty score0.050

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0030.001
Scholarly communication0.0020.001
Open science0.0020.001
Research integrity0.0020.001
Insufficient payload (model declined to judge)0.0040.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.011
GPT teacher head0.259
Teacher spread0.249 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designCase report
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2024
Admission routes2
Has abstractyes

Explore more

Same topicForest ecology and management→French-language works237,207→