MétaCan
Menu
Back to cohort
Record W4402527180 · doi:10.1016/j.cie.2024.110571

Enhancing socioeconomic sustainability in glass wall panel manufacturing: An integrated production planning approach

2024· article· en· W4402527180 on OpenAlexaff
Mohamed Khaled, Ibrahim Abdelfadeel Shaban, Hussien Hegab

Bibliographic record

VenueComputers & Industrial Engineering · 2024
Typearticle
Languageen
FieldEngineering
TopicManufacturing Process and Optimization
Canadian institutionsUniversity of Guelph
FundersCollege of Graduate Studies, United Arab Emirates UniversityUnited Arab Emirates University
KeywordsSustainabilitySocioeconomic statusProduction (economics)Production planningIntegrated productionManufacturing engineeringEngineeringBusinessEconomicsSociologyPopulation

Abstract

fetched live from OpenAlex

• Novel exploration of production planning complexities in labor-intensive industries. • Integration of social sustainability principles into scheduling models. • Development of a unique scheduling framework prioritizing worker well-being. • Validation of model efficacy through real-world production data analysis. • Comparative analysis reveals significant advantages of integrated socio-economic scheduling approach. While conventional production planning approaches prioritize short-term efficiency and economic gains, the sustainability development objectives emphasize a holistic perspective, integrating eco-friendly practices, social responsibility, and economic viability. Nevertheless, the existing literature overlooks a gap in understanding the role of socio-economic factors in labor-intensive production processes. In this regard, this research aims at investigating the impact of social factors, such as labor skill level and experience, on production planning, with a specific focus on glass wall panel manufacturing. The research integrates sustainability socioeconomics, as embodied by an empirically developed labor learning curve, with the MINLP (Mixed-Integer Nonlinear Programming) scheduling model. The results show that the integrated socio-economic scheduling approach outperforms traditional scheduling approach, reducing idle time up to 43% and promoting more balanced production distribution. Despite slightly higher upfront production costs, the integrated model offers long-term cost savings through reduced idle time and overtime, making it a viable option for companies seeking to improve productivity and worker satisfaction. The implementation of this work is recommended to maintain a sustainable, safe, and healthy work environment while also considering long-term economic benefits rather than short-term profits.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.375
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.024
GPT teacher head0.221
Teacher spread0.197 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2024
Admission routes1
Has abstractyes

Explore more

Same venueComputers & Industrial EngineeringSame topicManufacturing Process and OptimizationFrench-language works237,207