MétaCan
Menu
Back to cohort
Record W4404738988 · doi:10.1061/jaeied.aeeng-1868

Off-Site Construction Resilience: A Strategic Response to Inflation Challenges in Construction in Postpandemic Canada

2024· article· en· W4404738988 on OpenAlexaffabout
Amirhossein Mehdipoor, Ivanka Iordanova, Mohamed Al‐Hussein

Bibliographic record

VenueJournal of Architectural Engineering · 2024
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsUniversity of AlbertaÉcole de Technologie Supérieure
Fundersnot available
KeywordsResilience (materials science)Inflation (cosmology)Environmental resource managementEngineeringBusinessArchitectural engineeringEnvironmental planningEnvironmental science

Abstract

fetched live from OpenAlex

The COVID-19 triggered a period of inflation in Canada, with the Consumer Price Index increasing by an average of 3.4% in 2021, followed by 6.8% in 2022, and 3.9% in 2023. This rising inflation presents significant challenges for the construction industry, which accounts for over 1.5 million jobs and more than 7% of the country's economic activity. Two years after the pandemic, the inflationary environment was characterized by high, persistent, and volatile rates and influenced by factors beyond the industry's control. One effective approach to address these issues is to identify high-risk inflationary materials and create a price index based on historical market prices. Such a strategy allows project teams to track fluctuations in material prices and adjust project cost estimate. Embracing innovative strategies such as digitalized off-site construction and industrialized building systems can enhance the construction industry's resilience in the face of persistent inflation. This paper examines the impact of inflation on construction project budgets and project costs. Correlation coefficient tests are used to analyze the relationship between inflation rates and building construction prices. The results indicate a 14% increase in the contract sum attributable to inflation, a factor that may result in cost overruns. The findings point to the benefits of adopting off-site construction techniques as a strategic solution aimed at specifically countering the detrimental effects of cost overruns resulting from material waste and project delays, factors that not only escalate project costs but also significantly amplify the adverse impact of inflation on the project budget.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Qualitative · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.060
Threshold uncertainty score0.433

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0100.004
Scholarly communication0.0030.000
Open science0.0020.004
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0030.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.043
GPT teacher head0.303
Teacher spread0.259 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designQualitative
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2024
Admission routes2
Has abstractyes

Explore more

Same venueJournal of Architectural EngineeringSame topicConstruction Project Management and PerformanceFrench-language works237,207