Application of reinforcement learning for integrating project risk analysis and risk response planning: A case study on construction projects

2024· article· en· W4405397789 on OpenAlexvenueno aff
Sajad Soltan, Maryam Ashrafi

Bibliographic record

VenueJournal of Project Management · 2024
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsnot available
Fundersnot available
KeywordsReinforcementReinforcement learningProject risk managementRisk analysis (engineering)Computer scienceEngineeringProject managementBusinessSystems engineeringProject management triangleArtificial intelligenceStructural engineering

Abstract

fetched live from OpenAlex

Project Risk Management contains processes ranging from planning to control. It is applied to identify risks, analyze them, and design responses to change the occurrence rate and/or the effect of project risks. It is important for project managers to analyze the effects of the risks in projects and also consider project risks in their decisions. If project risks are not addressed during the risk management process, issues such as schedule delays, cost overruns, and even project failure may occur. This paper aims to introduce a Markov method to integrate project risk analysis and risk response planning. This method is applied to forecast the following status of the project when limited information about the project is available. Moreover, earned value management (EVM) methods were used to include various types of project risks through the project lifecycle. The model also offers the capability to choose the most effective risk response for managing project risks through the application of the Markov decision process (MDP). Eventually, we introduce a case study to demonstrate functionality and effectiveness of the presented approach. Solving the model allows for identifying the best set of risk response strategies tailored to each specific project state. The computational results illustrate that the current state of the project has a significant impact in the process of risk response planning. Since uncertainty is the inherent characteristic of projects, the use of the project’s current state is more reliable than the previous status of projects, and the Markov method is applied in this research because it uses the current state for its modelling. Using this method, managers can predict the future state of projects and find the best response in each status of projects.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.005
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.011
Threshold uncertainty score0.021

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.005
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.001
Science and technology studies0.0010.001
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0020.001
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.073
GPT teacher head0.409
Teacher spread0.336 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2024
Admission routes1
Has abstractyes

Explore more

Same venueJournal of Project ManagementSame topicConstruction Project Management and PerformanceFrench-language works237,207