MétaCan
Menu
Back to cohort
Record W4406192212 · doi:10.31959/js.v14i2.2731

PERENCANAAN ANGGARAN BIAYA DAN WAKTU PELAKSANAAN PEMBANGUNAN GEDUNG GEREJA KEHIDUPAN JEMAAT GPM

2024· article· id· W4406192212 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.

Bibliographic record

VenueJURNAL SIMETRIK · 2024
Typearticle
Languageid
FieldBusiness, Management and Accounting
TopicManagement and Optimization Techniques
Canadian institutionsEncana (Canada)
Fundersnot available
KeywordsArt

Abstract

fetched live from OpenAlex

Keberhasilan pada suatu proyek bangunan dilihat dari bagaimana proyek tersebut dapat diselesaikan tepat pada waktunya sesuai dengan anggaran yang telah direncanakan dan mutu proyek yang sesuai dengan kontrak. Pada pembangunan Gedung Gereja Kehidupan Jemaat GPM Rumahtiga Klasis Ambon Utara belum memiliki perhitungan Rencana Anggaran Biaya (RAB), Rencana Kerja dan Syarat (RKS), dan penyusunan waktu pelaksanaan pekerjaan sebagai bagian dari perencanaan konstruksi gedung. Tujuan dari penulisan ini adalah untuk mendapatkan besar anggaran biaya, menghasilkan RKS, dan menghasilkan waktu pelaksanaan pekerjaan. Metode yang digunakan dalam penulisan ini adalah dengan menggunakan metode Analisa Harga Satuan Pekerjaan (AHSP) Permen PUPR No. 8 Tahun 2023 dalam perhitungan RAB dan dalam penyusunan waktu pelaksanaan pekerjaan menggunakan metode PDM. Dari hasil penelitian diperoleh besar RAB berdasarkan AHSP Permen PUPR No. 8 Tahun 2023 adalah sebesar Rp 3,045,367,998.96 kemudian dibulatkan senilai Rp 3,045,000,000.00, RKS, dan durasi waktu pelaksanaan pekerjaan dengan menggunakan Metode PDM adalah selama 302 hari kalender atau 11 bulan 2 minggu.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Scholarly communication, Insufficient payload (model declined to judge)
Consensus categoriesInsufficient payload (model declined to judge)
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.840
Threshold uncertainty score0.999

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0020.000
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0040.005
Science and technology studies0.0010.000
Scholarly communication0.0050.003
Open science0.0010.001
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0100.003

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.016
GPT teacher head0.244
Teacher spread0.228 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it