Multi-objective optimization of prefabricated component construction scheduling based on hybrid NSGA-II algorithm in small assembly unit perspective
Bibliographic record
Abstract
In order to solve the inventory cost problem generated by the early delivery of components in the assembly building construction process, we establish a prefabricated component construction scheduling model considering the transportation stage, and at the same time, we consider that a large number of assemblers are needed in the prefabricated component construction process, introduce multi-skilled workers to form construction teams, a multi-objective optimization model with balanced completion time-cost-workload from the point of view of the worker's job satisfaction is established. Then, a hybrid NSGA-II algorithm is proposed to solve the model based on the characteristics of both NSGA-II and simulated annealing algorithms. Finally, the validity of the algorithm is verified through examples, and the model can provide a scientific method for construction scheduling.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".