MétaCan
Menu
Back to cohort
Record W4410160557 · doi:10.3390/civileng6020025

Value of Bayesian Pre-Posterior Information for Enhancing Life-Cycle Cost Analysis of Highway Investments

2025· article· en· W4410160557 on OpenAlexafffund
Baraa A. Alfasi, Ata M. Khan

Bibliographic record

VenueCivilEng · 2025
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsCarleton University
FundersNatural Sciences and Engineering Research Council of Canada
KeywordsBayesian probabilityValue of informationValue (mathematics)StatisticsEconometricsComputer scienceEconomicsTransport engineeringBusinessMathematicsEngineeringArtificial intelligence

Abstract

fetched live from OpenAlex

Assessing risk in life-cycle cost and benefit estimates of highway investments is recommended by major organizations such as the World Bank and the U.S. Federal Highway Administration. This challenging task needs methodological support. Mutually exclusive investment alternatives can differ in terms of the costs of construction, maintenance, rehabilitation, and end-of-life value. Due to many causal factors and the long life of highway infrastructure, these items cannot be estimated with certainty. To go beyond the study of the sources of uncertainty, a method is needed to check the economic feasibility of acquiring additional information for deeper insight. This paper reports on research on the value of Bayesian pre-posterior information for refining the life-cycle cost analysis of uncertain costs and benefits for evaluating highway investment alternatives. Example applications demonstrate how the Bayesian pre-posterior analysis can be applied to check the feasibility of obtaining new information for enhancing the life-cycle cost analysis of highway investments. The value of Bayesian pre-posterior information is illustrated for reducing risk. Also, depending upon the specifics of uncertain states, a change in the choice of the investment alternative for implementation can be investigated. The product of this research can potentially upgrade highway infrastructure planning and management practices.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.022
metaresearch head score (Gemma)0.111
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.022
Threshold uncertainty score0.117

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0220.111
Meta-epidemiology (narrow)0.0020.002
Meta-epidemiology (broad)0.0020.002
Bibliometrics0.0050.003
Science and technology studies0.0010.002
Scholarly communication0.0040.008
Open science0.0020.002
Research integrity0.0020.004
Insufficient payload (model declined to judge)0.0040.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.027
GPT teacher head0.343
Teacher spread0.315 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2025
Admission routes2
Has abstractyes

Explore more

Same venueCivilEngSame topicConstruction Project Management and PerformanceFrench-language works237,207