MétaCan
Menu
Back to cohort
Record W4412754756 · doi:10.11159/iccste25.183

Mitigating Technical Risks in School Construction Projects through a Risk Notification and Impact Estimation System

2025· article· en· W4412754756 on OpenAlexvenueno aff
Giuliana Barraza

Bibliographic record

VenueProceedings of the International Conference on Civil, Structural and Transportation Engineering · 2025
Typearticle
Languageen
FieldHealth Professions
TopicOccupational Health and Safety Research
Canadian institutionsnot available
Fundersnot available
KeywordsEstimationComputer scienceRisk analysis (engineering)Risk managementRisk assessmentBusinessComputer securityEngineeringSystems engineering

Abstract

fetched live from OpenAlex

The construction of schools faces technical risks that, if not managed properly, can generate delays and cost overruns, negatively impacting beneficiary communities.Previous studies highlight that early and proactive management of these risks, combined with appropriate strategies, can improve project efficiency and results.However, the lack of systematic approaches and advanced tools remains a major obstacle.In this context, this article proposes a potential risk notification system based on the principles of the Project Management Body of Knowledge (PMBOK) Guide and the latest version of the New Engineering Contract (NEC4) to facilitate the early identification of said risks, the qualitative and quantitative evaluation of their impact, and better communication and collaboration between those involved in the project.The contribution of the system lies in its ability to structure technical risk management in a precise and collaborative manner to mitigate its possible impacts on project deadlines and costs.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.008
metaresearch head score (Gemma)0.017
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.008
Threshold uncertainty score0.044

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0080.017
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0050.002
Science and technology studies0.0010.000
Scholarly communication0.0040.004
Open science0.0010.003
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0030.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.049
GPT teacher head0.392
Teacher spread0.343 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2025
Admission routes1
Has abstractyes

Explore more

Same venueProceedings of the International Conference on Civil, Structural and Transportation EngineeringSame topicOccupational Health and Safety ResearchFrench-language works237,207