MétaCan
Menu
Back to cohort
Record W4412755064 · doi:10.11159/iccste25.189

Reducing Subcontractor Progress Monitoring Time on Multifamily Building Finishes Using a BIM-Based

2025· article· en· W4412755064 on OpenAlexvenueno aff
Darwin Bazán, Libardo Gómez Díaz, Karem Ulloa

Bibliographic record

VenueProceedings of the International Conference on Civil, Structural and Transportation Engineering · 2025
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsBuilding information modelingComputer scienceArchitectural engineeringSystems engineeringEngineeringOperations management

Abstract

fetched live from OpenAlex

In multifamily project construction, specialty subcontracting is common, but monitoring subcontractors, especially during finishing, presents significant challenges due to manual methods that are time consuming, make it difficult to detect deviations, and result in cost overruns and delays.This research proposes an automated monitoring procedure using a BIM model that integrates tools such as Revit, Navisworks, MS Project and Trimble Connect.The methodology includes four stages: analysis of information through surveys, identification of the traditional procedure in three companies, development of the new automated approach and validation in a pilot project.The results show a 42.4% reduction in daily monitoring time for subcontractors and a 41.4% reduction for technical personnel, in addition to improved access to real-time information.This optimizes coordination, reduces errors and ensures compliance with deadlines, significantly improving resource management in multifamily projects.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.004
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.005
Threshold uncertainty score0.010

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.004
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0020.001
Science and technology studies0.0010.000
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0020.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.013
GPT teacher head0.235
Teacher spread0.221 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2025
Admission routes1
Has abstractyes

Explore more

Same venueProceedings of the International Conference on Civil, Structural and Transportation EngineeringSame topicBIM and Construction IntegrationFrench-language works237,207