Legal Perspectives on Information Asymmetry in Investor Selection for Public-Private Partnership Projects Under O&M Contract
Bibliographic record
Abstract
Information asymmetry is a common barrier in selecting investors in the form of Public-Private Partnerships (PPPs), especially in the Operation and Maintenance (O&M) contracts. This issue arises from the natural information advantage of the construction contractor and the incumbent investor in construction and operation. Although it does not stem from misconduct, such asymmetry still affects competitiveness and selection efficiency. The article analyzes the causes and legal consequences of this phenomenon through a comparative review of Vietnamese and Canadian legal frameworks while also assessing selected projects. The research methodology includes theoretical analysis, legal comparison, and a review of practical literature. The findings highlight the need for regulatory intervention to ensure fair competition, with the key solution being the establishment of obligations to share project data for potential investors.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.004 | 0.003 |
| Meta-epidemiology (narrow) | 0.001 | 0.001 |
| Meta-epidemiology (broad) | 0.002 | 0.001 |
| Bibliometrics | 0.002 | 0.007 |
| Science and technology studies | 0.001 | 0.000 |
| Scholarly communication | 0.003 | 0.013 |
| Open science | 0.001 | 0.000 |
| Research integrity | 0.001 | 0.001 |
| Insufficient payload (model declined to judge) | 0.000 | 0.001 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".