Bibliographic record
Abstract
This article discusses the early 2007 proposition by the Toronto Transit Commission in Canada outlining the construction of seven new light rail transit (LRT) lines to bolster the agency’s capacity. With an increase of 27 million riders between 2004 and 2006 alone, up to 445 million, operators explain that they aren’t able to keep up with rider loads using the current capacity. The C$6.1 billion project (US$5.3 billion) will, if approved, take 15 years to construct and serve an additional 175 million passengers. LRT was chosen as it will provide a lower volume of harmful emissions than buses while being about 1/10th the price of a subway system (which would need to be excavated). The cultural effects are also noted, as streetcar lines can bring commercial and residential vibrancy to a community. The article also discusses challenges along each of the new proposed corridors.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.001 | 0.001 |
| Meta-epidemiology (narrow) | 0.001 | 0.001 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.002 | 0.003 |
| Science and technology studies | 0.003 | 0.001 |
| Scholarly communication | 0.003 | 0.001 |
| Open science | 0.001 | 0.002 |
| Research integrity | 0.001 | 0.001 |
| Insufficient payload (model declined to judge) | 0.282 | 0.052 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".