MétaCan
Menu
Back to cohort
Record W622069772

Rion-Antirion Monitoring System

2008· article· en· W622069772 on OpenAlexaboutno aff
Aris Vlamis-Stathopoulos, Gilles Hovhanessian, Benoit Kroely

Bibliographic record

VenueSixth National Seismic Conference on Bridges and HighwaysMultidisciplinary Center for Earthquake Engineering ResearchSouth Carolina Department of TransportationFederal Highway AdministrationTransportation Research Board · 2008
Typearticle
Languageen
FieldEngineering
TopicConcrete Corrosion and Durability
Canadian institutionsnot available
Fundersnot available
KeywordsBridge (graph theory)Process (computing)Quality (philosophy)Bridge maintenancePlanned maintenanceControl (management)Management systemTransport engineeringEngineeringConstruction engineeringComputer scienceOperations managementForensic engineering
DOInot available

Abstract

fetched live from OpenAlex

VINCI group, the largest worldwide construction and concession group, operates exceptional structures and long span bridges such as the Confederation Bridge in Canada, Vasco de Gama Bridge in Portugal, Severn Crossing bridges in the United Kingdom (UK), and more recently, Rion-Antirion Bridge in Greece. European concession contracts commonly last over periods ranging from 20 to 70 years. Preventive inspections and structural maintenance represents significant challenges which occur over such periods. In the case of Gefyra, Operation Company of the Charilaos Trikoupis Bridge, also called Rion-Antirion Bridge, the concession period is 35 years. Therefore, Gefyra decided to work with Advitam to build methodologies and system to optimize structural inspection & the maintenance process. This includes a structural health monitoring system which provides real time monitoring of the bridge and automatic alarm management. The monitoring system is designed to monitor all critical elements of the bridge in order to detect abnormal behavior. It provides in particular automatic traffic management in case of earthquakes and high winds, which are common events in this part of the Gulf of Corinth. A very detailed Inspection & Maintenance manual, covering all aspects of long term maintenance includes: (1) Description & design of the project; (2) Periodic inspections; (3) Special event and post incident reaction plans; and (4) Preventive maintenance & heavy maintenance. A computerized inspection & maintenance system which improves quality and cost efficiency of the global process, as well as provides to the Greek authorities full quality control is described. The final article will briefly describe the methods and system involved, but will mainly focus on the benefits for the Concession Company and the Greek authorities.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.029
Threshold uncertainty score0.096

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0020.001
Science and technology studies0.0010.000
Scholarly communication0.0020.001
Open science0.0020.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0290.020

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.067
GPT teacher head0.313
Teacher spread0.245 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2008
Admission routes1
Has abstractyes

Explore more

Same venueSixth National Seismic Conference on Bridges and HighwaysMultidisciplinary Center for Earthquake Engineering ResearchSouth Carolina Department of TransportationFederal Highway AdministrationTransportation Research BoardSame topicConcrete Corrosion and DurabilityFrench-language works237,207