PLANNING AND ORGANISATION OF WORK IN THE 4D BIM PROJECT OF AN INDUSTRIAL BUILDING
Bibliographic record
Abstract
This research aimed to systematise data on the use of 4D planning technologies, consider problems that arise during the implementation and identify methods for solving them by implementing an experiment through a practical example. The pilot 4D project involved eight employees who implemented the 4D BIM project from an existing 3D BIM model. Work on the 4D model is carried out in two different ways: through separate files with subsequent integration into a single 4D model and through a configured server (SYNCHRO Workgroup Project [SWP]) in a single file with a shared access. The analysis of the possible problems, the ways to solve them in the formation of a 4D model and the potential barriers to the introduction of this technology is carried out. During this research, the necessary requirements for 3D models for a proper 4D planning are determined.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.001 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.001 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".