MétaCan
Menu
Back to cohort

PLANNING AND ORGANISATION OF WORK IN THE 4D BIM PROJECT OF AN INDUSTRIAL BUILDING

2023· article· en· W6926247125 on OpenAlexaff

Bibliographic record

Venuecyberleninka.ru · 2023
Typearticle
Languageen
FieldMedicine
TopicMicrobial Natural Products and Biosynthesis
Canadian institutionsNickel Institute
Fundersnot available
KeywordsWorkgroupWork (physics)Building information modelingProject planningScheme (mathematics)Work breakdown structure

Abstract

fetched live from OpenAlex

This research aimed to systematise data on the use of 4D planning technologies, consider problems that arise during the implementation and identify methods for solving them by implementing an experiment through a practical example. The pilot 4D project involved eight employees who implemented the 4D BIM project from an existing 3D BIM model. Work on the 4D model is carried out in two different ways: through separate files with subsequent integration into a single 4D model and through a configured server (SYNCHRO Workgroup Project [SWP]) in a single file with a shared access. The analysis of the possible problems, the ways to solve them in the formation of a 4D model and the potential barriers to the introduction of this technology is carried out. During this research, the necessary requirements for 3D models for a proper 4D planning are determined.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: Bench or experimental
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.133
Threshold uncertainty score0.221

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.068
GPT teacher head0.315
Teacher spread0.247 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2023
Admission routes1
Has abstractyes

Explore more

Same venuecyberleninka.ruSame topicMicrobial Natural Products and BiosynthesisFrench-language works237,207