MétaCan
Menu
Back to cohort
Record W6965214505 · doi:10.2760/007407

Wind and other CO2-free assets replacing coal in 2030: A scenario analysis based on the EUCO3232.5 scenario with the METIS model

2020· other· en· W6965214505 on OpenAlexaboutno aff

Bibliographic record

VenueJoint Research Centre (European Commission) · 2020
Typeother
Languageen
Field
Topic
Canadian institutionsnot available
Fundersnot available
KeywordsScenario analysisCoalCarbon footprintFootprintElectric power systemPower (physics)Wind powerElectricity generation

Abstract

fetched live from OpenAlex

An up-to-date partial coal phase out scenario based on the power system and prices defined in the EUCO3232.5 scenario for 2030 is analysed with the METIS power system model. Following the removal of coal and lignite fleets in excess of half the capacity present in the EUCO scenario, the power system experiences more often power scarcity, primarily in the Central-West region of Europe. The study explores the potential of new wind capacity to fill the vacuum created by the coal fleet retirements both in energy and capacity terms. The conclusion of the previous similar study of 2018, that new wind capacity predominantly placed in peripheral regions of Europe (South-east, South-west and the North), has the potential to balance the system was tested for multiple climatic years. The modelling analysis showed that new capacity consisting of 85 GW of additional wind power (compared to the EUCO3232.5) supported by additional infrastructure would be sufficient to restore adequacy. The additional infrastructure identified in this study consists of approximately 8.2 GW of batteries, very limited new peaking generation (up to 0.5 GW) and 53 GW of interconnection upgrades. \nThe interconnector’s role as a definitive enabler, not only of market integration but also of a path towards a renewables-based power system is strongly supported by the results. The identified transmission upgrades alone have the potential to reduce the carbon footprint of the European power system by more than a quarter, compared to the EUCO3232.5, with minimal additions of peaking capacity.\nIn a scenario variant where no additional wind is added to the system, the modelling results indicate that only an additional 4.2 GW of peaking capacity (OCGTs) and 14.8 GW of battery storage on top of the EUCO3232.5 capacities, would be sufficient to restore adequacy to the power system, following the assumed coal fleet decommissioning. In a second scenario used to benchmark the results, with no interconnection upgrades we find that the flexible resource requirements rise sharply to 21 GW of battery storage and 22.3 GW of thermal peaking capacity.\n The cost of the additional infrastructure was estimated for all scenarios and benchmarked against the potential CO2 savings. Under the EUCO3232.5 fuel price assumptions replacing coal with wind power would lead to an annual additional cost ranging between 1.9 and 4.5 € Billion which would correspond to an incremental abatement cost between 7.4 and 18.2 €/tonne CO2 in 2030.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.048
Threshold uncertainty score0.096

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.002
Bibliometrics0.0010.001
Science and technology studies0.0000.000
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0020.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.078
GPT teacher head0.306
Teacher spread0.228 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2020
Admission routes1
Has abstractyes

Explore more

Same venueJoint Research Centre (European Commission)French-language works237,207