MétaCan
Menu
Back to cohort
Record W6980704365

Conception parasismique de piles de ponts constituées d'éléments préfabriqués

2023· other· fr· W6980704365 on OpenAlexaboutno aff

Bibliographic record

VenuePolyPublie (École Polytechnique de Montréal) · 2023
Typeother
Languagefr
FieldMaterials Science
TopicX-ray Diffraction in Crystallography
Canadian institutionsnot available
Fundersnot available
KeywordsFilter (signal processing)NucleofectionPopulationWork (physics)
DOInot available

Abstract

fetched live from OpenAlex

RÉSUMÉ: «RÉSUMÉ: L’accroissement constant des densités de population et donc du trafic routier, combiné au vieillissement des infrastructures routières telles que les ponts arrivant pour bon nombre à la fin de leur vie utile, implique des besoins rapides et efficaces pour la construction ou reconstruction des structures. C’est dans cette optique que le concept de Construction Accélérée de Ponts (CAP) a vu le jour. Bien que ce concept soit revendiqué depuis plusieurs décennies, c’est dans les vingt dernières années que sa popularité a grandi de manière exponentielle. Avec sa popularité, les techniques utilisées ont aussi évolué, et ce notamment grâce au développement de nouveaux matériaux innovants tels que les Bétons Fibrés à Ultra-hautes Performances (BFUP). Le BFUP, ce matériau aux comportements et propriétés exceptionnels pour un béton, n’est pas développé pour remplacer le béton ordinaire, car il s’agit d’un matériau coûteux, mais il doit être utilisé en combinaison avec les bétons ordinaires. Dans la construction accélérée de ponts, ce béton peut par exemple être utilisé dans les joints d’assemblages des éléments préfabriqués, joints qui représentent souvent des zones critiques pour les structures face notamment aux efforts sismiques. Aussi, le BFUP est un matériau formidable pour la réhabilitation, c’est ainsi que des travaux ont été réalisés à Polytechnique Montréal, montrant l’efficacité du BFUP dans la réhabilitation de piles de ponts. La réhabilitation consistait à substituer le béton normal par du BFUP dans la zone de chevauchement des armatures à la base de la pile. Ces essais ont montré des résultats plus que satisfaisants et ont donné naissance à un programme de recherche, toujours à Polytechnique Montréal, dont le but est le développement de piles et culées de ponts entièrement conçues à partir d’éléments préfabriqués permettant de rencontrer les performances parasismiques attendues par les normes canadiennes. Pour les piles de ponts, le concept repose sur une connexion en BFUP entre la colonne et la semelle.» ABSTRACT: «ABSTRACT: The constant increase in population density and thus road traffic, combined with the aging of road infrastructure such as bridges reaching the end of their service life for many, implies rapid and efficient needs for the construction or reconstruction of structures. It is in this context that the concept of Accelerated Bridge Construction (ABC) has emerged. Although this concept has been advocated for several decades, its popularity has grown exponentially in the past twenty years. Along with its popularity, the techniques used to have also evolved, notably through the development of innovative materials such as Ultra-High-Performance Fibre-Reinforced Concretes (UHPFRC). UHPFRC, a material with exceptional behaviour and properties for concrete, is not developed to replace ordinary concrete as it is costly. Instead, it should be used in combination with ordinary concrete. In accelerated bridge construction, for example, concrete can be used in the joints of prefabricated elements, which often represent critical areas for structures, particularly in seismic conditions. Additionally, UHPFRC is a remarkable material for rehabilitation. Work carried out at Polytechnique Montréal demonstrated the efficiency of UHPFRC in rehabilitating bridge piers. The rehabilitation involved replacing normal concrete with UHPFRC in the overlapping area of the bar at the base of the pier. These tests showed highly satisfactory results and led to a research program at Polytechnique Montréal aimed at developing bridge piers and abutments entirely designed from prefabricated elements to meet the seismic performance expected by Canadian standards. For bridge piers, the concept relies on a UHPFRC connection between the column and the base, both of which are prefabricated elements.»

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.001
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Research integrity, Insufficient payload (model declined to judge)
Consensus categoriesMeta-epidemiology (narrow), Insufficient payload (model declined to judge)
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: none
Teacher disagreement score0.596
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0020.001
Meta-epidemiology (narrow)0.0010.002
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0020.001
Science and technology studies0.0010.001
Scholarly communication0.0010.001
Open science0.0020.001
Research integrity0.0020.001
Insufficient payload (model declined to judge)0.0060.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.014
GPT teacher head0.257
Teacher spread0.243 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; both teacher heads agree on what is shown here.

Study designNot applicable
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2023
Admission routes1
Has abstractyes

Explore more

Same venuePolyPublie (École Polytechnique de Montréal)Same topicX-ray Diffraction in CrystallographyFrench-language works237,207