MétaCan
Menu
Back to cohort
Record W6990038395

Contractual incentives between the main contractor and third parties for better performance in a Bouwteam

2023· dissertation· en· W6990038395 on OpenAlexfundno aff

Bibliographic record

VenueResearch Repository (Delft University of Technology) · 2023
Typedissertation
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsnot available
FundersCanadian Pulmonary Fibrosis Foundation
KeywordsNucleofectionGestational periodHyporeflexiaTSG101Fusible alloyHyperlactatemiaDemotion
DOInot available

Abstract

fetched live from OpenAlex

In the last decade, the Bouwteam concept has become increasingly popular in the construction industry. A Bouwteam agreement is a bilateral agreement between a client and a main contractor, in which the main contractor is involved at an early stage. An advantage of a Bouwteam collaboration is that risks which occur in the construction phase are mitigated in the design phase. In practice, both the client and the main contractor can employ third parties to transfer parts of their design responsibilities. In the recent Bouwteam models, there is the possibility that a substantial part of the design responsibility is passed on to the main contractor and his third parties. These third parties have an increasing influence on the achievement of project goals, which are usually the design quality, design costs, design planning and client satisfaction. Hence, this research is focused on the implementation of contractual incentives for the designing third parties, who are employed by the main contractor in a Bouwteam. The contractual incentives are used to influence the performance of these third parties, in such a way that Bouwteam goals are achieved.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.034
metaresearch head score (Gemma)0.041
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Methods · Consensus signal: none
Teacher disagreement score0.034
Threshold uncertainty score0.177

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0340.041
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0020.002
Science and technology studies0.0040.005
Scholarly communication0.0100.007
Open science0.0020.008
Research integrity0.0030.004
Insufficient payload (model declined to judge)0.0120.002

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.085
GPT teacher head0.368
Teacher spread0.283 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreMethods

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2023
Admission routes1
Has abstractyes

Explore more

Same venueResearch Repository (Delft University of Technology)Same topicConstruction Project Management and PerformanceFrench-language works237,207