MétaCan
Menu
Back to cohort
Record W6996515905

Silver Lake Spring Shore Panorama, Waterloo Park ON Canada

2025· other· en· W6996515905 on OpenAlexaboutno aff

Bibliographic record

VenueInternet Archive (Internet Archive) · 2025
Typeother
Languageen
Field
Topic
Canadian institutionsnot available
Fundersnot available
KeywordsShoreSpring (device)Square (algebra)ArchitectureGentryHeadlandCoveWindsorMarshBay
DOInot available

Abstract

fetched live from OpenAlex

A late-spring stroll around Waterloo Park’s Silver Lake, featuring waterside scenic views. Formed by Laurel Creek's impounding, millpond originally powered Pennsylvania-German Mennonite immigrant Abraham Erb’s 1816 gristmill. The 111 hectare (275 acre) park began with the 1890 purchase of Jacob Eby's 26 ha (65 ac) waterside farm. In 1806, Abraham and his wife Magdalena (nee Erb) settled on 365 ha (900 ac) of swampy land beside Beaver (now Laurel) Creek, which he purchased in 1805 from Jacob and Daniel Erb. Erb's two-storey grist mill operated for 111 years. Today's replica, near the old millrace, is a typical 1800s generic design. An Ontario heritage plaque provides a brief biography of Abraham Erb: "Like many pioneers of this district, the founder of Waterloo was a German Mennonite from Franklin County, Pennsylvania. In 1805 he purchased 365 hectares of bush land on the site of this town. He settled here in 1806 and erected the first sawmill two years later. His gristmill, built in 1816, remained in continuous operation for 111 years and formed the nucleus and social centre of a thriving municipality." The Perimeter Institute of Theoretical Physic’s distinctive buildings overlook Silver Lake. Saucier & Perrotte designed the 2004 building, receiving the Governor-General's Medal of Architecture in 2006. Teeple Architects designed the 2011 gold-glazed Stephen Hawking Centre. L aurel C reek's streambed and course have been heavily modified since the early nineteenth century. A 500 metre concrete culvert, built in 1960 for the Waterloo Square development,channels the creek beneath Bridgeport Road and King Street to Regina Street South where it emerges near the Waterloo City Centre (1987). The creek continues to another culvert beneath Erb Street East. Silver Lake was dredged in 1997 to remove recurring silt deposits. More dredging and channel improvements were part of the $5 million 2020-23 Waterloo Park rehabilitation project. A plaque, titled ‘Central Promenade Trail Project’, mounted near the west-side pedestrian bridge states: “This pedestrian bridge and lookout celebrates Canada’s 150 th birthday and was made possible thanks to the generosity of TD Bank Group through the TD Common Ground Project.” Two logos appear below the text: ‘THE CITY OF WATERLOO’ and ‘TD’ For more information about the project's three new water fountains, see 'Waterloo Park Relaunch; the Jewel of the City' (https://crystalfountains.com/projects/waterloo-park/)

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Research integrity, Insufficient payload (model declined to judge)
Consensus categoriesMeta-epidemiology (narrow), Insufficient payload (model declined to judge)
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.047
Threshold uncertainty score0.999

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0030.003
Meta-epidemiology (broad)0.0020.001
Bibliometrics0.0020.000
Science and technology studies0.0000.001
Scholarly communication0.0000.000
Open science0.0040.002
Research integrity0.0000.003
Insufficient payload (model declined to judge)0.0380.019

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.222
Teacher spread0.213 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; both teacher heads agree on what is shown here.

Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2025
Admission routes1
Has abstractyes

Explore more

Same venueInternet Archive (Internet Archive)French-language works237,207