MétaCan
Menu
Back to cohort
Record W7006003981

Summary report on the Huron and Ontario Ship Canal.

2014· article· en· W7006003981 on OpenAlexaboutno aff

Bibliographic record

VenueQSpace (Queen's University Library) · 2014
Typearticle
Languageen
FieldEarth and Planetary Sciences
TopicMarine Invertebrate Physiology and Ecology
Canadian institutionsnot available
Fundersnot available
KeywordsMarine safetyWork (physics)FishingNatural (archaeology)
DOInot available

Abstract

fetched live from OpenAlex

shall permit the passage of sea-going vessels of 1200 tons bur- then.*It will, of course, be necessary to the completeness of the communication with the sea, that the St. Lawrence Canals be correspondingly enlarged, and that some improvements be made to the natural channel of the river, but as these works would involve only a, comparatively, small cost, it may be assumed that they will either immediately follow the construcof this Canal or be executed simultaneously therewith.The effect of this canal will be, to diminish the distance be- tween the upper lakes and tide-water, whether at Quebec or New York, about 400 miles ; to avoid the tedious and comparatively unsafe navigation of lakes St. Clair and Erie, and the shoal waters of the St. Clair Flats, and to enable a class of large screw steamers and ocean-going vessels to pass from any of the upper lake ports to the sea, or across the Atlantic, * The origin of this project is thus described by Kivas Tully, Esq., C. E., in a report to the Toronto Board of Trade in 1866." The proposed route of the canal, to unite the waters of Lakes Huron, Simcoe and Ontario, was first explored by me in 1846.In 1851 a second exploration was made, and I ran a line of levels between the head waters of the Humber and Holland Rivers, on the Simcoe level, but no action was taken in the matter by the gentlemen who employed me, namely, Sheriff Jarvis, Dr. Bees, Dr. Hayes, and the late Vice-Chancellor Jamieson.'"In 1857 a charter was granted incorporating the Toronto and Georgian Bay Canal Company, with a capital stock of $24,000,000.Under a Provisional Board of Directors, Mr. Tully's services were again engaged, and as engineer of the work, he made a complete survey of the line, locating the canal, and published his report with maps, profile, &c, estimating the pro- bable cost at $22,170,750.No further action, however, was then taken.In 1865 the present Provisional Directors obtained an amended charter under the name of the Huron and Ontario Ship Canal Company.Mr. Tully was, at their first meeting, appointed Engineer, but shortly afterwards resigned on account of the claims of other professional engagements.It must be gratifying to him, after having so firmly maintained the perfect feasibility of this great work, against the contrary opinion very generally expressed, to find his judgment confirmed by the first Engineers in Britain.His profes- sional labours on this project, formed the ground-work for his successor, Mr.Sykes, but all the details of the work, as set forth in Mr. Sykes' report, are entirely his own, and he estimates the cost at $35,989,800.The accompanying Maps were published by Mr. Tully in 1857.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.127
Threshold uncertainty score0.426

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.003
Science and technology studies0.0020.000
Scholarly communication0.0020.001
Open science0.0010.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.1270.034

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.152
Teacher spread0.144 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2014
Admission routes1
Has abstractyes

Explore more

Same venueQSpace (Queen's University Library)Same topicMarine Invertebrate Physiology and EcologyFrench-language works237,207