Innoframe: a project and portfolio management multilayer framework to support innovation-driven SMEs
Bibliographic record
Abstract
The purpose of this research was to discover what frameworks for project, portfolio, and innovation management there are and if necessary to propose a new framework useful for SMEs of the construction and building materials industry. Design/methodology/approach - The methodology used in this research was the case study, in which the Canadian construction and building materials industry was selected. The research was based on literature review, interviews, group discussion and survey. Findings - Although there are currently many frameworks available for the three management areas (project, portfolio and innovation), research has shown that a framework that helps companies to follow an approach that supports their business at these three levels is lacking. Originality/value - Innoframe is a new framework for project, portfolio, and innovation management that incorporates a pipeline and two phases as well as a performance management matrix, that can be used for project and portfolio management, to support innovation-driven SMEs.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.008 | 0.008 |
| Meta-epidemiology (narrow) | 0.001 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.001 |
| Bibliometrics | 0.003 | 0.002 |
| Science and technology studies | 0.001 | 0.001 |
| Scholarly communication | 0.006 | 0.007 |
| Open science | 0.002 | 0.007 |
| Research integrity | 0.001 | 0.001 |
| Insufficient payload (model declined to judge) | 0.002 | 0.001 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".