Report on the drainage and sewerage of the City of Montreal, shewing the location, and estimated cost of the system of main outlet and intercepting sewers proposed to be constructed for the thorough and effectual drainage of the city.
Bibliographic record
Abstract
a Resolution was passed to the effect that the City Surveyor be instructed to make such examinations and surveys of the City as would enable him to project and lay down such a system of main sewers as would thoroughly and effectually drain the City, and to submit plans, sections and estimates of the cost of said main sewers so required.These instructions -an outline of which is given above-I received in the beginning of October, the delay being occasioned on account of there being no funds appropriated for the purposes of the sur- vey.I commenced the survey and examinations on the 3rd of October, 1856, and since then have devoted all the time to its completion which I could spare from other more pressing duties.This survey, which you intrusted me with, is now completed, and I have the honor to submit to you the following Report on the system of main sewers which I propose to lay down.This Re- port is accompanied with a detailed estimate of the cost of all the main sewers proposed to be constructed, and taken out in separate items as the different lengths of sewer and the work on it, is heavy or light ; also detailed plans of the side entrances, cross- drains ; the outlet at Ruisseau Migeon ; plans and sections of the several junctions of the sewers; plans and sections of the main sewers, shewing the details of construction, and their pro- posed fall and depth below the surface ; plans, sections and elevations of public privies and urinals to be constructed in connection 5o 5r57 1 VlS * The plans, sections, and detailed drainings of the sewers have not been litfr >- graphed, owing to the cost and delay of time which would be incurred by so doing; but a topographical plan of the City, shewing the position and direction of all the main sewers, as well as the valley of the River St. Pierre, has been lithographed, and is attached, to illustrate this Report.water and sewerage passes into the river.Should it be possible to lay down a system of which the old sewers would form a part, then a great saving would arise from not having the portion of the old sewers retained to construct anew.It is evident, then, the first ground of inquiry should be as to the present state of the main sewers, their levels and construction, and generally whether they would be of any value in a properly extended sys- tem such as the one about to be proposed.The whole of the sewerage, soil water and rain water, passes into the river now through three outlets, representing three of the largest natural drainages into which the City is divided.The first, and by far the largest of these, outlets into the Elgin Basin, opposite the Custom House.It takes the whole of the drainage of the City lying between St. Lawrence Main Street and the ridge dividing the waters of the creek which runs by the Lachine Railway sta- tion from the River St. Pierre, the waters of the swamp under Coteau Baron ; as well as the drainage of Point St. Charles which comes through the Culvert under the Canal.These seve- ral drainages unite at Dow's Brewery, and flows through the College grounds in an open channel to St. Ann's Market, and from thence in a covered culvert, built of stone, and arched over, to the outlet at the Elgin Basin.It will be seen that a large portion of this sewerage water flows in open courses, the sides and banks of which are very dirty, from the accumulation of filth of all kinds from time to time deposited there and left by the water, when its depth and flow was not strong enough to remove it.This drainage division of the City embraces Griifintown and the most thickly populated portion of the Craig Street valley.The rainwater and sewerage of the Craig Street valley from Saint Lawrence Main Street, flows through the main sewer known as the Craig Street Tunnel to St. Antoine Bridge, and thence in open cut to Chaboillez Square and Dow's Brewery, joining the creek coming by the Lachine Railway station, mentioned before, shew- ing that at Dow's Brewery the principal drainages of this division meet and unite in one stream.The Craig Street Tunnel Sewer, between
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.001 | 0.001 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.001 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".