Megaproject management – case studies of Torino, Vancouver and Milano Winter Olympic Games
Bibliographic record
Abstract
Olympic Games are giant projects that need to be planned and monitored carefully since the purpose of project is to realize all the tasks within the planned times and costs. The aim of this article is to present two of the past Olympic Winter Games: Torino 2006 and Vancouver 2010 in order to identify success and failures concerning the project management of these megaprojects. The analysis in the research was conducted using case study method. Under some project constrains, the first presented case is considered as an example of failure, while the second one as a successful project. Moreover, the future Olympics of Milano 2026 is presented, which has the chance of becoming a megaproject well man-aged. The article includes the conclusion section presenting the potential of the project of Torino 2026 Olympic Games and the recommendations based on the management of the previous examples of megaprojects.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.003 | 0.001 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.001 | 0.001 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.001 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".