MétaCan
Menu
Back to cohort
Record W7073808996

Value of pumped-storage hydro for wind power integration in the British Columbia hydroelectric system

2010· other· en· W7073808996 on OpenAlexfundaboutno aff

Bibliographic record

VenuecIRcle (University of British Columbia) · 2010
Typeother
Languageen
FieldEngineering
TopicElectric Power System Optimization
Canadian institutionsnot available
FundersBC Hydro
KeywordsWind powerHydropowerExclosureIntellectualizationScale (ratio)Production (economics)
DOInot available

Abstract

fetched live from OpenAlex

In the next few years, the province of British Columbia will experience the installation of significant amounts of wind power as part of BC Hydro calls for clean renewable energy resources. The inherent variability and uncertainty of wind power will impact the operation of the BC Hydro system. If the system loses some of its flexibility in the process of integrating more wind power, there are costs that need to be assessed and recognized. Of particular interest are the costs associated with incremental wind reserves to manage wind variability and the cost associated with foregoing day-ahead market opportunities due to the wind forecast error. Pumped-storage hydro systems have been proposed as a good technology to complement wind generation due to their ability to manage wind energy imbalances over time. This research investigated the feasibility of expanding an existing hydropower system by installing a pumped-storage hydro system to mitigate the impacts of integrating wind in a large scale hydro system. This study proposed the installation of an additional pump station, equipped with automatic generation control capabilities. Two optimization models were developed to assess the benefits of the pumped-storage hydro system and the impacts of wind integration: A long-term mixed integer optimization, and a short-term stochastic linear optimization models to simulate BC Hydro short-term operations considering different load and wind stochastic scenarios. Both models are an extension of the BC Hydro Generalized Optimization Model (GOM), which is a deterministic linear optimization model that has been used to assess many capital investments and water use planning studies for the BC Hydro system. The model proposed in this research included a stochastic extension of GOM. Optimization runs of the BC Hydro’s hourly system operation for one year, with and without the pumped-storage hydro system were carried out and their outcomes were compared to estimate the overall benefits of the pump-storage system. The results indicated that there are benefits of installing a pumped-storage hydro system in the BC Hydro system to manage and to reduce wind power integration impacts. The benefits increased as more wind power is installed in the BC Hydro system.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.722
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0010.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.003
GPT teacher head0.149
Teacher spread0.146 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2010
Admission routes2
Has abstractyes

Explore more

Same venuecIRcle (University of British Columbia)Same topicElectric Power System OptimizationFrench-language works237,207