TransCanada to change name to TC Energy
Bibliographic record
Abstract
TransCanada Corp., the company behind the contentious Keystone XL oil pipeline, is changing its name to TC Energy. If approved by shareholders and regulators, TransCanada becomes TC Energy in the second quarter. The stock ticker "TRP" will not change. The company behind the controversial Keystone XL oil pipeline is changing its name.If approved by shareholders and regulators, TransCanada Corporation will become TC Energy in the second quarter.The project, which has been marred by protests, is being delayed by a federal court because it found that the Trump Administration didn't fully consider the environmental effects when it approved the permit for the pipeline.Environmentalists and Native American groups had sued to stop the pipeline, which is intended to ship up to 830,000 barrels a day of crude oil from Canada to the U.S. Gulf Coast, citing property rights and possible spills.A hearing on the proposed pipeline is scheduled for Monday in Great Falls, Montana.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.001 | 0.001 |
| Meta-epidemiology (broad) | 0.001 | 0.000 |
| Bibliometrics | 0.002 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.002 | 0.001 |
| Research integrity | 0.000 | 0.001 |
| Insufficient payload (model declined to judge) | 0.014 | 0.021 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; both teacher heads agree on what is shown here.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".