MétaCan
Menu
Back to cohort
Record W7091586216 · doi:10.5683/sp3/ecadi7

An agent-oriented approach to resolve scheduling optimization in intelligent manufacturing

2025· dataset· en· W7091586216 on OpenAlexaff

Bibliographic record

VenueBorealis · 2025
Typedataset
Languageen
FieldEngineering
TopicManufacturing Process and Optimization
Canadian institutionsUniversity of Toronto
Fundersnot available
KeywordsScheduling (production processes)Agent architectureIntelligent agentDynamic priority schedulingJob shop schedulingTwo-level schedulingIntelligent decision support systemArchitectureAutomated planning and scheduling

Abstract

fetched live from OpenAlex

Agent technology is considered as a promising approach for developing optimizing process plans in intelligent manufacturing. As a bridge between computer aided design (CAD) and computer aided manufacturing (CAM), the computer aided scheduling optimization (CASO) plays an important role in the computer integrated manufacturing (CIM) environment. In order to develop a multi-agent-based scheduling system for intelligent manufacturing, it is necessary to build various functional agents for all the resources and an agent manager to improve the scheduling agility. Identifying the shortcomings of traditional scheduling algorithm in intelligent manufacturing, the architecture of intelligent manufacturing system based on multi-agent is put forward, among which agent represents the basic processing entity. Multi-agent-based scheduling is a new intelligent scheduling method based on the theories of multi-agent system (MAS) and distributed artificial intelligence (DAI). It views intelligent manufacturing as composed of a set of intelligent agents, who are responsible for one or more activities and interacting with other related agents in planning and executing their responsibilities. In this paper, the proposed architecture consists of various autonomous agents that are capable of communicating with each other and making decisions based on their knowledge. The architecture of intelligent manufacturing, the scheduling optimization algorithm, the negotiation processes and protocols among the agents are described in detail. A prototype system is built and validated in an illustrative example, which demonstrates the feasibility of the proposed approach. The experiments prove that the implementation of multi-agent technology in intelligent manufacturing system makes the operations much more flexible, economical and energy efficient.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Dataset · Consensus signal: Dataset
Teacher disagreement score0.325
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.013
GPT teacher head0.243
Teacher spread0.230 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designSimulation or modeling
Domainnot available
GenreDataset

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2025
Admission routes1
Has abstractyes

Explore more

Same venueBorealisSame topicManufacturing Process and OptimizationFrench-language works237,207