Seleucid royal cities as a model for Artaxata? Considerations on the urban planning of the Hellenistic Armenian capital
Bibliographic record
Abstract
In 187 BC, Artaxias I turned Armenia, previously ruled by the Seleucids, into an independent kingdom and founded a new capital, Artaxata. Buildings on a range of hills are known from this city; it is however unclear how far the city extended into the plain. It is also uncertain where the palace was located. Based on the assumption that Artaxata was modeled on the royal cities of the Seleucids, an attempt is made hereafter to reconstruct the outlines of the original urban planning of Artaxata. If the premise is correct, Artaxias would have planned a city of 600 ha or more from the outset, encompassing the entire area between the ancient course of the Metsamor, the Araxes and the chain of hills. Inside, it would have a regular street grid and insulae of identical size. The palace district would be located in the south at the mouth of the Metsamor and Araxes and would cover around a quarter of the city’s area.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.002 | 0.002 |
| Meta-epidemiology (narrow) | 0.001 | 0.000 |
| Meta-epidemiology (broad) | 0.001 | 0.001 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.003 | 0.003 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.001 | 0.000 |
| Research integrity | 0.000 | 0.001 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".