MétaCan
Menu
Back to cohort
Record W7162436449 · doi:10.32628/ijsrce215513

Enhance the Quality of the Management System for BOT road Transport Investment Project in Viet Nam

2021· article· W7162436449 on OpenAlexaff
Dang Hoang Tuan, Le Manh Tuong, Đinh Đăng Quang, Le Hoai Linh, Le Phi Vu

Bibliographic record

VenueInternational Journal of Scientific Research in Civil Engineering · 2021
Typearticle
Language
FieldBusiness, Management and Accounting
TopicPublic-Private Partnership Projects
Canadian institutionsTransport Canada
Fundersnot available
KeywordsInvestment (military)Transparency (behavior)TollGovernment (linguistics)Quality (philosophy)Management systemControl (management)Legislation

Abstract

fetched live from OpenAlex

The PPP (Public Private Partnership) contract has been applied in Vietnam for 13 years, initially achieved certain success, ensuring the project's goals, contributing to providing the basis technical infrastructure for the economic development of the country. But from the perspective of investment efficiency, socio-economic efficiency, people's interests are not achieved, there are too many shortcomings, group interests are rampant, public opinion and public opinion are against the total investment. Investment, fee rates, environment, ... State audit, Government inspectors discovered hundreds of projects with problems that had to cut down on toll collection time, toll rates, and staff involved in the project. reasons for hiding revenue, tax evasion, etc. In addition, there are other violations such as quality, maintenance, and environment during the exploitation period that must be adjusted.From the perspective of state management, the form of PPP investment is now fully operational, with a full system of management and control tools, but the socio-economic efficiency is still low. The transparency of the project is being opposed by the public, the ability to attract investment is poor, especially foreign investors lack confidence and do not participate. That shows that the "quality of management system" is not effective, there should be a solution to improve the quality of the management system for the type of investment in the form of PPP.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.025
metaresearch head score (Gemma)0.001
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesScholarly communication
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.447
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0250.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.004
Science and technology studies0.0000.000
Scholarly communication0.0010.001
Open science0.0030.001
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.118
GPT teacher head0.392
Teacher spread0.273 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designTheoretical or conceptual
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2021
Admission routes1
Has abstractyes

Explore more

Same venueInternational Journal of Scientific Research in Civil EngineeringSame topicPublic-Private Partnership ProjectsFrench-language works237,207