MétaCan
Menu
Back to cohort
Record W792827197

Rocky Mountain Legacy Trail

2014· article· fr· W792827197 on OpenAlexaboutno aff
D Langhorst

Bibliographic record

VenueTransportation 2014: Past, Present, Future - 2014 Conference and Exhibition of the Transportation Association of Canada // Transport 2014 : Du passé vers l'avenir - 2014 Congrès et Exposition de 'Association des transports du Canada · 2014
Typearticle
Languagefr
FieldEngineering
TopicUnderground infrastructure and sustainability
Canadian institutionsnot available
Fundersnot available
KeywordsRecreationGeographyVisitor patternTourismGeneral partnershipStakeholderEnvironmental resource managementArchaeologyPolitical science
DOInot available

Abstract

fetched live from OpenAlex

The Rocky Mountain Legacy Trail is a multi-modal paved trail connecting the Town of Canmore to Banff National Park. Completed in September 2013, the Trail spans 4.5 km from the Travel Alberta Visitor Information Centre in Canmore to the east gate of Banff National Park, where it ties in to the Banff Legacy Trail, extending an additional 26 km west to the Bow Valley Parkway. The Legacy Trail network now provides full linkage between the Towns of Canmore and Banff, promoting safe and sustainable travel for both commuters and recreational users. Additionally, it forms part of the larger Trans Canada Trail, a 17,000 km trail network that connects 1,000 communities across Canada. The Town of Canmore coordinated the Rocky Mountain Legacy Trail on behalf of the Bow Corridor Regional Mobility Partnership, a joint venture between the Town of Canmore, the Town of Banff, the Municipal District of Big Horn, and Parks Canada. Additional stakeholders included Alberta Transportation; Alberta Tourism, Parks and Recreation; Alberta Sustainable Resource Development; ATCO Pipelines; and Canadian Pacific Railway. Collaborating with such a diverse stakeholder group required creative thinking as well as innovative and equitable financing arrangements, to manage contributions from the various municipalities and agencies involved in the project. Although not directly involved in design or construction of the Rocky Mountain Legacy Trail, the Alberta TrailNet Society and the Trans Canada Trail Foundation were also important stakeholders in the project. The Alberta TrailNet Society supports the ongoing development of Alberta’s trail network, and the Trans Canada Trail Foundation promotes the development and use of the Trans Canada Trail in all provinces and territories. The Rocky Mountain Legacy Trail is a shining example of what these organizations are striving to achieve.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Insufficient payload (model declined to judge)
Consensus categoriesMeta-epidemiology (narrow)
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.283
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0020.000
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0020.001
Bibliometrics0.0000.001
Science and technology studies0.0010.000
Scholarly communication0.0000.002
Open science0.0010.000
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0020.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.004
GPT teacher head0.184
Teacher spread0.180 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; both teacher heads agree on what is shown here.

Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2014
Admission routes1
Has abstractyes

Explore more

Same venueTransportation 2014: Past, Present, Future - 2014 Conference and Exhibition of the Transportation Association of Canada // Transport 2014 : Du passé vers l'avenir - 2014 Congrès et Exposition de 'Association des transports du CanadaSame topicUnderground infrastructure and sustainabilityFrench-language works237,207