Egyptian LNG - The Value of Standardisation
Notice bibliographique
Résumé
This reference is for an abstract only. A full paper was not submitted for this conference. Abstract Key decisions at the beginning of any grassroots LNG project critically impact the ultimate success of the project. The variables to consider are numerous but from a high-level perspective, commercial variables such as available gas reserves, finance ability, corporate objectives and market penetration must be considered in combination with project related variables such as schedule, capital expenditures, and life cycle costs. The ultimate objective is to develop a strategy providing the highest rate of return to the owners whilst taking full account of the risks that can be managed by the owners. Shipping logistics, pre-investment for expansion trains, safety and environmental impact, technology selection and EPC contracting strategy all come into consideration early on in the process. One of the factors that most shape a LNG project is train capacity. Given the importance of economies of scale, the LNG train size that is chosen, along with the associated refrigeration turbine/compressor configuration, is a key decision that impacts almost all other variables. However, since the train capacity impacts so many project factors, the correct choice for one project is not necessarily the correct choice for another. The unique challenges that each project faces must be considered in order to arrive at the best decision for a given project. This paper draws on the experience of the Egyptian LNG project which is one of several grassroots projects started in the 2000's that remained with the nominal train size of 3.6 MTPA that became standard in the last half of the1990's. It should be noted that 3.6 MTPA is an annualized FOB rate - the actual PFD rate or design rate of the facility is over 4 MTPA. Some other contemporary projects have designed at 5 MTPA and one recent project has announced a 7.5MTPA train. Is it possible for smaller trains to compete in today's LNG business? The overall strategy for the Egyptian LNG project has been to standardize on the design developed for Atlantic LNG Trains 1–3. In this paper, we will provide an evaluation of the key considerations leading to this strategy and show that highly competitive capital costs can be achieved with smaller trains whilst also significantly reducing project schedule and minimizing owner risk.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,001 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,007 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».