Egyptian LNG - The Value of Standardisation

2005· article· en· W2002666260 on OpenAlexaff
P. Redding, A.A. Avidan, W.R. Quails, Rick Hernandez

Bibliographic record

VenueInternational Petroleum Technology Conference · 2005
Typearticle
Languageen
FieldEnvironmental Science
TopicMaritime Transport Emissions and Efficiency
Canadian institutionsConocoPhillips (Canada)
Fundersnot available
KeywordsScheduleTrainInternal rate of returnProject managementGrassrootsMarket penetrationOperations researchBusinessOperations managementFinanceEnvironmental economicsComputer scienceEngineeringEconomicsMarketing

Abstract

fetched live from OpenAlex

This reference is for an abstract only. A full paper was not submitted for this conference. Abstract Key decisions at the beginning of any grassroots LNG project critically impact the ultimate success of the project. The variables to consider are numerous but from a high-level perspective, commercial variables such as available gas reserves, finance ability, corporate objectives and market penetration must be considered in combination with project related variables such as schedule, capital expenditures, and life cycle costs. The ultimate objective is to develop a strategy providing the highest rate of return to the owners whilst taking full account of the risks that can be managed by the owners. Shipping logistics, pre-investment for expansion trains, safety and environmental impact, technology selection and EPC contracting strategy all come into consideration early on in the process. One of the factors that most shape a LNG project is train capacity. Given the importance of economies of scale, the LNG train size that is chosen, along with the associated refrigeration turbine/compressor configuration, is a key decision that impacts almost all other variables. However, since the train capacity impacts so many project factors, the correct choice for one project is not necessarily the correct choice for another. The unique challenges that each project faces must be considered in order to arrive at the best decision for a given project. This paper draws on the experience of the Egyptian LNG project which is one of several grassroots projects started in the 2000's that remained with the nominal train size of 3.6 MTPA that became standard in the last half of the1990's. It should be noted that 3.6 MTPA is an annualized FOB rate - the actual PFD rate or design rate of the facility is over 4 MTPA. Some other contemporary projects have designed at 5 MTPA and one recent project has announced a 7.5MTPA train. Is it possible for smaller trains to compete in today's LNG business? The overall strategy for the Egyptian LNG project has been to standardize on the design developed for Atlantic LNG Trains 1–3. In this paper, we will provide an evaluation of the key considerations leading to this strategy and show that highly competitive capital costs can be achieved with smaller trains whilst also significantly reducing project schedule and minimizing owner risk.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesInsufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.707
Threshold uncertainty score0.994

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0070.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.006
GPT teacher head0.229
Teacher spread0.223 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2005
Admission routes1
Has abstractyes

Explore more

Same venueInternational Petroleum Technology ConferenceSame topicMaritime Transport Emissions and EfficiencyFrench-language works237,207