MétaCan
Menu
Retour à la cohorte
Enregistrement W2060002361 · doi:10.4043/18353-ms

Status of Cape Wind Offshore Wind Project

2006· article· en· W2060002361 sur OpenAlexaff
Craig Olmsted

Notice bibliographique

RevueOffshore Technology Conference · 2006
Typearticle
Langueen
DomaineEngineering
ThématiqueMarine and Offshore Engineering Studies
Établissements canadiensAlberta Energy
Organismes subventionnairesnon disponible
Mots-clésOffshore wind powerCapeSubmarine pipelineWind powerMarine engineeringGeologyMeteorologyEnvironmental scienceOceanographyGeographyEngineeringElectrical engineeringArchaeology

Résumé

récupéré en direct d'OpenAlex

Abstract This is a summary to date of the current status of the Cape Wind Project, America's first offshore wind energy project. Basic project information from conception through permitting, construction, operation and maintenance is offered. As this endeavor continues, a significant portion of the installation, operation and maintenance could utilize the resources, capability and creativity of the domestic offshore industry To date, the domestic offshore industry has not had the opportunity to play a direct role in offshore wind farm construction, operation and maintenance. This paper introduces the reader to a large spectrum of likely consultants, suppliers, constructors and managers of offshore facilities The paper provides information to a wide range of conferees on the background, status and needs of the emerging US offshore wind industry in general and the Cape Wind project in particular. It is expected to generate interest in multiple areas as a new source for potential business opportunities. Introduction This paper is meant to answer some of the most commonly asked questions such as:Who is Cape Wind?Why wind power?Why Nantucket Sound?What is the current status?What is the potential for offshore industry involvement Discussion Cape Wind Associates LLC (CWA) is a limited liability company. Most of the members are the senior management of Energy Management Inc. (EMI) of Boston Massachusetts. EMI has provided services to develop, own, operate and maintain various projects over its thirty plus year history. The core group of investors in most of these projects has been consistent throughout. In 2000, it appeared that natural gas fired generation in New England had reached saturation. Supply of natural gas would become increasingly tight and merchant power plants may be put at risk for fuel supply. The core group decided to test the market for sales of its assets in natural gas fired power plants. With 830 MW of generation, it became apparent that these assets were more valuable to entities with larger portfolios and were sold. Projects developed in the past had always been on the cutting edge of technology and the most environmentally ‘clean’ power plants of their time. We developed both the first independent power plant in New England and the first pure merchant plant in the US. The next logical step was to develop a completely emission free energy plant. Both the Commonwealth of Massachusetts (through the Renewable Portfolio Standard) and the federal government (through the Production Tax Credit) provided incentives to develop renewable energy facilities. This combination fit with the model of projects we had developed in the past. We began to look for the most appropriate technology to serve this purpose. We studied various renewable technologies including wave, solar tidal and wind power. The only technology that appeared to satisfy our goal of developing a utility scale facility that would be commercially viable was wind power. The next challenge was to find workable locations to evaluate as potential sites. A review of wind regimes in New England revealed that the only general areas with enough wind were the mountainous areas of western New England and offshore as shown in Figure 1 (courtesy of AWS Truewind).

Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.

Comment cette classification a été obtenuedéplier

Prédiction distillée sur la base complète

Imitation des enseignants

Ni prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.

score de la tête « metaresearch » (Codex)0,000
score de la tête « metaresearch » (Gemma)0,000
Version: codex-gemma-dda1882f352aStatut de validation: machine_predicted_unvalidated
Catégories candidatesMéta-épidémiologie (sens strict)
Catégories consensuellesaucune
DomaineSignal candidat: aucune · Signal consensuel: aucune
Devis d'étudeSignal candidat: Observationnel · Signal consensuel: aucune
GenreSignal candidat: Empirique · Signal consensuel: Empirique
Score de désaccord entre enseignants0,471
Score d'incertitude au seuil1,000

Scores Codex et Gemma par catégorie

CatégorieCodexGemma
Métarecherche0,0000,000
Méta-épidémiologie (sens strict)0,0000,000
Méta-épidémiologie (sens large)0,0010,000
Bibliométrie0,0010,001
Études des sciences et des technologies0,0000,000
Communication savante0,0000,000
Science ouverte0,0000,000
Intégrité de la recherche0,0000,000
Charge utile insuffisante (le modèle a refusé de juger)0,0000,000

Scores machine (provisoires)

Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.

Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.

Tête enseignante Opus0,012
Tête enseignante GPT0,224
Écart entre enseignants0,212 · la distance entre les deux têtes enseignantes sur ce seul travail
Statut de validationscore_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découle

Classification

machine, non validée

Prédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.

Devis d'étudeObservationnel
Domainenon disponible
GenreEmpirique

Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».

En bref

Citations1
Publié2006
Routes d'admission1
Résumé présentoui

Explorer davantage

Même revueOffshore Technology ConferenceMême sujetMarine and Offshore Engineering StudiesTravaux en français237 207