Record W2060002361 · doi:10.4043/18353-ms

Status of Cape Wind Offshore Wind Project

2006· article· en· W2060002361 on OpenAlexaff
Craig Olmsted

Bibliographic record

VenueOffshore Technology Conference · 2006
Typearticle
Languageen
FieldEngineering
TopicMarine and Offshore Engineering Studies
Canadian institutionsAlberta Energy
Fundersnot available
KeywordsOffshore wind powerCapeSubmarine pipelineWind powerMarine engineeringGeologyMeteorologyEnvironmental scienceOceanographyGeographyEngineeringElectrical engineeringArchaeology

Abstract

fetched live from OpenAlex

Abstract This is a summary to date of the current status of the Cape Wind Project, America's first offshore wind energy project. Basic project information from conception through permitting, construction, operation and maintenance is offered. As this endeavor continues, a significant portion of the installation, operation and maintenance could utilize the resources, capability and creativity of the domestic offshore industry To date, the domestic offshore industry has not had the opportunity to play a direct role in offshore wind farm construction, operation and maintenance. This paper introduces the reader to a large spectrum of likely consultants, suppliers, constructors and managers of offshore facilities The paper provides information to a wide range of conferees on the background, status and needs of the emerging US offshore wind industry in general and the Cape Wind project in particular. It is expected to generate interest in multiple areas as a new source for potential business opportunities. Introduction This paper is meant to answer some of the most commonly asked questions such as:Who is Cape Wind?Why wind power?Why Nantucket Sound?What is the current status?What is the potential for offshore industry involvement Discussion Cape Wind Associates LLC (CWA) is a limited liability company. Most of the members are the senior management of Energy Management Inc. (EMI) of Boston Massachusetts. EMI has provided services to develop, own, operate and maintain various projects over its thirty plus year history. The core group of investors in most of these projects has been consistent throughout. In 2000, it appeared that natural gas fired generation in New England had reached saturation. Supply of natural gas would become increasingly tight and merchant power plants may be put at risk for fuel supply. The core group decided to test the market for sales of its assets in natural gas fired power plants. With 830 MW of generation, it became apparent that these assets were more valuable to entities with larger portfolios and were sold. Projects developed in the past had always been on the cutting edge of technology and the most environmentally ‘clean’ power plants of their time. We developed both the first independent power plant in New England and the first pure merchant plant in the US. The next logical step was to develop a completely emission free energy plant. Both the Commonwealth of Massachusetts (through the Renewable Portfolio Standard) and the federal government (through the Production Tax Credit) provided incentives to develop renewable energy facilities. This combination fit with the model of projects we had developed in the past. We began to look for the most appropriate technology to serve this purpose. We studied various renewable technologies including wave, solar tidal and wind power. The only technology that appeared to satisfy our goal of developing a utility scale facility that would be commercially viable was wind power. The next challenge was to find workable locations to evaluate as potential sites. A review of wind regimes in New England revealed that the only general areas with enough wind were the mountainous areas of western New England and offshore as shown in Figure 1 (courtesy of AWS Truewind).

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.006
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.039
Threshold uncertainty score0.131

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.006
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.002
Science and technology studies0.0020.001
Scholarly communication0.0030.002
Open science0.0010.002
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0390.005

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.012
GPT teacher head0.224
Teacher spread0.212 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2006
Admission routes1
Has abstractyes

Explore more

Same venueOffshore Technology ConferenceSame topicMarine and Offshore Engineering StudiesFrench-language works237,207