A two-stage framework for power transformer asset maintenance management—Part II: Validation results
Notice bibliographique
Résumé
A two-stage framework for transformer maintenance management is introduced and formulated in Part I of this two-part paper in the context of transmission asset management strategies (TAMS). The proposed model optimizes maintenance outage schedule over a predefined period of time by taking into account the actual and expected transformer assets' condition dynamics in terms of failure rate and resource limitations in midterm horizons, as well as operating constraints, economic considerations and N-1 reliability in the shorter term. In Part II, a small six-bus system is first used to demonstrate how the two-stage maintenance framework works using a step-by-step procedure. Then, IEEE-RTS is used to investigate the performance of the proposed model in more detail. In addition, the impacts of varying the characteristics of the proposed midterm and short-term maintenance schedulers, such as flexibility in time horizon selection, on maintenance scheduling results and computational efficiency are investigated on IEEE-RTS. The numerical studies indicate that the proposed framework gives appropriate results in terms of economics and technical constraints at a reasonable computational cost.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,001 | 0,001 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».