Development of Oil Sands : Overview of Hangingstone Expansion project
Notice bibliographique
Résumé
Canada has the third-largest oil reserves in the world, after Saudi Arabia and Venezuela. Of Canada's 173 billion barrels of oil reserves, 170 billion barrels are located in Alberta, of which about 168 billion barrels are recoverable from bitumen. In 2012, 1.8 million bbl/day were produced from the oil sands of which 800,000 bbl/day was from mining and 1.0 million bbl/day were recovered by in situ techniques. Looking ahead to 2020, oil sands production will reach 3.2 million bbl/day by the end of the outlook. And in situ production is forecast to produce more than 2.0 million bbl/day.JACOS (Japan Canada Oil Sands Limited: subsidiary company of JAPEX) started their expansion project at Hangingstone lease in Alberta, Canada.The Hangingstone Expansion Project is a joint venture project to develop an area adjacent to the current Demonstration Project by JACOS and Nexen Energy ULC (Nexen) in which JACOS holds a 75% participating interest as the operator, while Nexen holds the remaining 25% interest. Completing the front end engineering design and obtaining Scheme Approval from the Alberta provincial government in November, 2012, the partners have commenced full-scale development work aiming at production start-up in 2016.The initial stage will result in bitumen production capacity of around 20,000 barrels per day. A decision on expansion of the facilities to bitumen production capacity of approximately 30,000 barrels per day will be made after start-up of the operation. Bitumen production will continue for around 30 years using the steam-assisted gravity drainage (SAGD) method, which has already been utilized at the Hangingstone Demonstration operation for more than 10 years.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».