Bibliographic record
Abstract
Canada has the third-largest oil reserves in the world, after Saudi Arabia and Venezuela. Of Canada's 173 billion barrels of oil reserves, 170 billion barrels are located in Alberta, of which about 168 billion barrels are recoverable from bitumen. In 2012, 1.8 million bbl/day were produced from the oil sands of which 800,000 bbl/day was from mining and 1.0 million bbl/day were recovered by in situ techniques. Looking ahead to 2020, oil sands production will reach 3.2 million bbl/day by the end of the outlook. And in situ production is forecast to produce more than 2.0 million bbl/day.JACOS (Japan Canada Oil Sands Limited: subsidiary company of JAPEX) started their expansion project at Hangingstone lease in Alberta, Canada.The Hangingstone Expansion Project is a joint venture project to develop an area adjacent to the current Demonstration Project by JACOS and Nexen Energy ULC (Nexen) in which JACOS holds a 75% participating interest as the operator, while Nexen holds the remaining 25% interest. Completing the front end engineering design and obtaining Scheme Approval from the Alberta provincial government in November, 2012, the partners have commenced full-scale development work aiming at production start-up in 2016.The initial stage will result in bitumen production capacity of around 20,000 barrels per day. A decision on expansion of the facilities to bitumen production capacity of approximately 30,000 barrels per day will be made after start-up of the operation. Bitumen production will continue for around 30 years using the steam-assisted gravity drainage (SAGD) method, which has already been utilized at the Hangingstone Demonstration operation for more than 10 years.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.001 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".