Fully utilizing the IED capability to reduce wiring
Notice bibliographique
Résumé
Each wired termination in a substation represents a cost associated with engineering, installing and testing that wired point. These costs include the obvious financial labor costs, but also include intangible costs such as installation and commissioning time, potential for human error, panel space, increased resistive burden in circuits, and larger raceways. Additionally, each wired termination represents stranded engineering time that is used design these terminations rather than allowing the engineering staff to solve problems. Most utility wiring design practices are taken for granted without thought as to the true cost and reliability of the practice and whether or not the function can be implemented with less wiring. Some standard utility practices have evolved that seek to minimize wiring. An example of this practice is the use of multifunction microprocessor based relays that can logically develop a trip bus from protective elements rather than having to wire individual elements to create the same trip bus. This paper seeks to expose some of the hidden financial costs and reliability costs associated with copper process wiring. Additionally this paper will discuss ways in which modern lEDs can be fully implemented to further reduce wiring. The cost and reliability benefits associated with the reduced wiring will be discussed and quantified. Some of the solutions to be addressed include the use of breaker lEDs as an interface for breaker control, IED to SCADA communications, IED to IED communications, internal lockout Relays, IED pushbutton control, and process bus. Each of these solutions are currently available in today's market place and have varying degrees of acceptance within the industry. The benefits and liabilities of each solution using traditional IED implementation versus maximized IED implementation shall be discussed.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».