Real-Time Flood Monitoring and Management of a Mississippi River Pipeline Crossing
Notice bibliographique
Résumé
Enbridge Liquids Pipelines (Enbridge) operates over 26,000 km of liquid pipelines in Canada and the US, administers a system-wide geohazard management program to identify, investigate and monitor geohazards, and performs remediation as required. An integral part of the geohazard management program is real-time flood monitoring, where pipeline watercourse crossings affected by flooding are identified and flood levels monitored. Watercourse crossings where the pipelines have a high potential to become exposed, to span, and potentially to fail during a flood event are studied in more detail. This flood monitoring program automatically monitors publicly available real-time stream gauge flow measurements and compares these measurements to estimated discharge thresholds for the crossing under evaluation. Thresholds are related to the current pipeline depth of cover (DOC) and the amount of scour that can occur over a range of flood magnitudes. Thresholds include: 1) the estimated peak flow to expose the top of the pipe, “exposure flow”, 2) the estimated peak discharge and associated flow velocities that could create enough free spanning pipe for the onset of vortex induced vibration (VIV) fatigue failure, “flow of concern”, and 3) where additional mechanical assessment taking account of specific pipe properties, data requirements and circumstances has been carried out, the “critical flow”, the estimated average peak flow and duration that has the potential to result in product release due to VIV once a sufficient pipe span length has developed, “critical flow”. This paper is a case study of an assessment and flood monitoring of one of Enbridge’s Mississippi River pipeline crossings, which has a history of flood-related pipeline exposure and subsequent mitigations. During real-time monitoring of a 2015 flood event the “exposure flow” and “flow of concern” thresholds for this crossing were exceeded, resulting in a decision by Enbridge to shut down the pipeline. Subsequent surveys revealed that the pipe had become exposed and was spanning adjacent to the previously remediated area. The previous mitigation likely limited the length of pipe exposure and pipe span. Added complexity was encountered during the post shutdown DOC survey, which needed to be completed as quickly and safely as possible after flood levels declined to allow for an assessment of the actual condition of the pipeline prior to restart. This paper presents a methodology that could allow pipeline operators to identify river crossings susceptible to pipe exposure, and the potential for freespan development, due to flooding, by providing an understanding of what is likely happening to the cover over the pipe at a particular crossing during a flood event. This provides a tool to better manage pipeline river crossings experiencing flooding. As far as the authors are aware, this case study represents the first time a pipeline has been shut down based on real-time flows and thresholds in the United States.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».